Tru-Grit Abrasives Inc
The Department of Ecology is overseeing a cleanup of the Tru-Grit Abrasives Inc (Tru-Grit) site. Ecology identified two potentially liable parties (PLPs) who are conducting and paying for the cleanup: CanAm Minerals, Inc. (CanAm) and the Port of Tacoma (Port).
Cleanup is being conducted through a legal agreement, Agreed Order No. DE 8978 (download 3.8 MB), between Ecology and CanAm. This agreement was signed on July 11, 2012. The Port, who are the current landowners, signed an amendment (download 517 KB) to the agreed order which added them as a PLP to the site. This amendment was made effective on August 4, 2026.
Cleanup Progress As Of August 2026
Last Update: August 10, 2026
Cleanup for the entire site is ongoing. CanAm and the Port of Tacoma are studying the site and considering cleanup options. Once the studies are complete, Ecology will review the findings. The studies and considerations (called a Remedial Investigation and Feasibility Study) will inform the development of a draft Cleanup Action Plan. Before Ecology approves these documents, the public will have an opportunity to review and comment on them.
Right now, the Port has proposed an interim action cleanup at the site. The purpose of this interim action would be to remove contaminated sediment from an in-water area, specifically the lower slope area, in preparation for the US Army Corps of Engineers’ larger Blair Waterway Federal Navigational Channel deepening project. The Port of Tacoma is performing this interim action work.
Description
The Tru-Grit site is located at 1110 Alexander Avenue in the Tacoma Tideflats, on the northeastern side of the Blair Waterway. The site has been used for grit processing since at least 1993.
In 2007, the Port of Tacoma acquired the property. CanAm Minerals, Inc. (CanAm) continued operations at the site under a lease with Port until the lease expired on July 31, 2020. Today, CanAm is still in operation at a different property, located at 3701 Taylor Way, and is now known as KleenBlast.
Contamination
Contamination at the site is in marine sediment in and along the shoreline of the Blair Waterway. Sources of the contamination include minerals from an offloading facility operated by Tru-Grit and its parent company, CanAm Minerals, Inc., as well as past shipyard operations.
Ecology inspections from 2005 - 2011 found that grit, which contains high levels of copper and zinc, had escaped from a storage pile at the site. The grit has been found around the property, under a ship-to-shore conveyor, and in Blair Waterway sediments. In 2008, sediment sampling found copper and zinc contamination in the Blair Waterway near Tru-Grit.
Stay Informed
Ecology will keep the public informed as the cleanup progresses. To receive updates about this site:
- Sign up for updates by clicking the blue “Subscribe to this site” button at the top right corner of this page. Subscribers receive a weekly automated email whenever there’s an open comment period, a new document, or other cleanup news. You can read more about this feature on Ecology's blog.
- Subscribe to Ecology’s email list to receive updates on our cleanup work being done in the Tacoma Tideflats/Commencement Bay area.
Documents 23
Legal 6
| Document Title | Document Date | Document Type |
| Tru Grit Abrasives Inc - Amended AO | 8/4/2026 | Agreed Order Amendment |
| Final Determination of Potential Liability for Release Hazardous Substances at Tru-Grit Site | 6/26/2026 | Final Potentially Liable Person Status Letter |
| Tru-Grit Preliminary determination of liability | 5/13/2026 | 30-Day Notice of Potential Liability |
| Final Signed Agreed Order | 7/18/2012 | Agreed Order |
| PLP Notice Tru-Grit Roofing Granules | 1/23/2012 | Final Potentially Liable Person Status Letter |
| PLP Notice Tru Grit Roofing Granules 1110 E Alexander Ave Tacoma | 12/19/2011 | Final Potentially Liable Person Status Letter |
Outreach Information 4
| Document Title | Document Date | Document Type |
| Tru-Grit Comment Period Extension Postcard | 8/24/2026 | Fact Sheet\Public Notices |
| Tru-Grit - 2026 Fact Sheet for IAP, SEPA, and PPP | 8/10/2026 | Fact Sheet\Public Notices |
| Tru-Grit - Draft Public Participation Plan | 8/10/2026 | Public Participation Plan |
| TruGrit Abrasives Fact Sheet | 6/15/2012 | Fact Sheet\Public Notices |
State Environmental Policy Act 1
| Document Title | Document Date | Document Type |
| Tru-Grit - SEPA DNS and Checklist for 2026 Interim Action | 8/24/2026 | SEPA Documents |
Technical Reports 12
| Document Title | Document Date | Document Type |
| Tru-Grit - Draft Interim Action Plan | 8/24/2026 | Interim Action Plans and Reports |
| Tru-Grit Site Ecology Comments- Sediment Characterization Report and Interim Action Plan | 4/8/2026 | Interim Action Plans and Reports |
| Tru Grit - Draft Sediment Characterization Report | 1/15/2026 | Site Specific Technical Document - Other |
| SQAPP Addendum Final #2 | 8/20/2025 | Site Specific Technical Document - Other |
| SQAPP Addendum Final | 3/25/2025 | Site Specific Technical Document - Other |
| 1294 Tru-Grit Abrasives SHARP Report | 9/11/2024 | Site Hazard Assessment and Ranking Process Report |
| Tru-Grit - Draft Remedial Investigation Report - Main Report and Appendices A-B | 12/17/2021 | Remedial Investigation Report |
| Tru-Grit - Draft Remedial Investigation Report - Appendices C-F | 12/17/2021 | Remedial Investigation Report |
| Tru Grit - Draft Feasibility Study | 12/2/2019 | Feasibility Study |
| Supplemental Work Plan Tru-Grit Site (sediment/bioassay) | 1/25/2018 | Remedial Investigation Work Plan |
| Tru-Grit Abrasives RI/FS Work Plan | 2/6/2013 | Remedial Investigation Work Plan |
| True Grit Roofing Granules SHA | 1/20/2011 | Site Hazard Assessment Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
-
Tacoma Public Library1102 Tacoma Avenue STacoma, 98402This location may only have print documents available during open comment periods.
Contaminants 9
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Metals - Metals - Other | B | S | C | |||
| Halogenated Organics - Polychlorinated biPhenyls (PCB) | B | |||||
| Non-Halogenated Organics - Phenolic Compounds | B | |||||
| Halogenated Organics - Dioxins/Furans | C | |||||
| Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | |||||
| Metals - Arsenic | C | |||||
| Metals - Lead | C | |||||
| Metals - Mercury | B | |||||
| Non-Halogenated Organics - Other Non-Halogenated Organics | B |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
Public Comment Period
Ecology invites you to review and share your comments on documents related to the cleanup of hazardous substances at the Tru-Grit Abrasives Inc cleanup site. Your feedback is an important part of this process.
We are seeking public input on the following:
To aid in your review, we also prepared a fact sheet (download 1.1 MB). The fact sheet provides context about the site and summarizes the key points of the documents listed above.
After the public comment period, we will:
How to Submit Comments:
The public comment period is open from 8:00 AM on August 10, 2026, to 11:59 PM on September 24, 2026. Ecology extended the comment period from September 10 to September 24 after re-uploading the draft Interim Action Plan with Appendix C included.
You can submit your comments to Ecology using one of the following methods:
Valerie Chu, Site Manager
Toxics Cleanup Program
PO Box 47775
Olympia, WA 98504-7775
Email: Valerie.Chu@ecy.wa.gov
Questions:
For any questions regarding this public comment period, please contact Abby Zabrodsky, Public Involvement Coordinator: