TransAlta Centralia
Site Location
Site History
The power plant was constructed in 1968. The first boiler was installed in 1971, and the second boiler was installed in 1972. TransAlta Centralia Generation LLC (TransAlta) bought the plant in 2000. In 2011, the Washington Legislature required TransAlta to stop using one boiler by 2020 and the other boiler by 2025.
The plant generated electricity from coal, which may have caused contamination in air, soil, groundwater, and sediment at the facility. Therefore, Ecology is requiring cleanup to protect human health and the environment.
Contamination At The Site
Running a coal-fired power plant can cause several different types of contamination. For example, coal ash has metals in it, such as mercury and arsenic. The plant used fuels like diesel which could have leaked out of tanks or pipelines. Burning coal in a boiler makes smoke, which might have toxic chemicals in it. The plant released smoke outside through tall smokestacks, where it could have drifted away from the plant.
TransAlta has started collecting data to understand contamination at the plant. They collected samples from soil, groundwater, and sediment (dirt at the bottom of the ponds). So far, they have found contamination from metals, fuels, and solvents.
Now, Ecology is requiring TransAlta to finish these studies under a Model Toxics Control Act agreed order. More information will be available for public comment when a draft report is ready.
Sign Up For Updates
If you would like to be added to the email or mail list for this site, please reach out to carolyn.subramaniam@ecy.wa.gov. Our staff will email you at key stages in the cleanup process and notify you about public comment periods or public meetings.
To receive automatic emails from our system when new documents are uploaded to this website or a public comment period opens, please click the blue "Subscribe to this site" button in the top right corner of the webpage. For more information about this website feature, please check out this blog.
Documents 7
Legal 4
| Document Title | Document Date | Document Type |
| TransAlta Centralia Agreed Order No. DE 24235 | 12/29/2025 | Agreed Order |
| Final TransAlta Centralia PLP Status | 10/14/2025 | Final Potentially Liable Person Status Letter |
| TransAlta Centralia Preliminary PLP Letter | 9/4/2025 | 30-Day Notice of Potential Liability |
| TransAlta Centralia Early Notice Letter | 8/1/2025 | Early Notice Letter |
Outreach Information 2
| Document Title | Document Date | Document Type |
| TransAlta Centralia Public Comment Period December 2025 | 12/30/2025 | Fact Sheet\Public Notices |
| TransAlta Centralia Public Participation Plan | 12/30/2025 | Public Participation Plan |
Technical Reports 1
| Document Title | Document Date | Document Type |
| TransAlta Centralia Initial Investigation | 6/2/2025 | State Initial Investigation Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 7
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Metals - Metals - Other | C | C | C | |||
| Halogenated Organics - Dioxins/Furans | B | |||||
| Halogenated Organics - Halogenated Solvents | C | |||||
| Metals - Arsenic | C | C | ||||
| Metals - Mercury | C | |||||
| Non-Halogenated Organics - Petroleum-Diesel | C | |||||
| Non-Halogenated Organics - Petroleum-Other | B |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated