Holden Mine is an old copper, zinc, and gold mine in the Cascade Mountains of Chelan County, Washington. Mining was active from 1937 to 1957, and when it was shut down the mine waste was left behind. Over decades, rain, snowmelt, and groundwater have carried metals and acidic water into soils, creeks, and sediment downstream. The cleanup is important because about 70 people live at Holden Village and up to 6000 people visit each year. These people may be at risk and the natural environment (creeks, wetlands, fish, forests) is heavily affected.
Ecology is working cooperatively with other government partners including, the Yakama Nation and other sovereign tribal groups, the US Forest Service (USFS) and the Environmental Protection Agency (EPA) towards cleanup of the site. USFS is the lead agency for cleanup. For more information visit the USFS Holden Mine Site webpage. During the late 1980s and early 1990s, the Forest Service reduced erosion of the tailings piles by installing streambank protection, rerouting drainage, and covering the piles with gravel. This interim action improved site conditions; however, several potential threats to human health and the environment still exist.
Ecology is working cooperatively with other government partners including, the Yakama Nation and other sovereign tribal groups, the US Forest Service (USFS) and the Environmental Protection Agency (EPA) towards cleanup of the site. USFS is the lead agency for cleanup. For more information visit the USFS Holden Mine Site webpage. During the late 1980s and early 1990s, the Forest Service reduced erosion of the tailings piles by installing streambank protection, rerouting drainage, and covering the piles with gravel. This interim action improved site conditions; however, several potential threats to human health and the environment still exist.
Current Status
The large and complex cleanup of this site has been planned in a phased approach: Phase 1, stabilization and capping the hazardous tailings and waste rock has been completed. Phase 2 is focused on capturing and treating impacted mine drainage, groundwater, and seeps to stop the ongoing release to protect the health of the local residents and surrounding communities.
Select Site Documents
Documents 39
Legal 5
Document Title | Document Date | Document Type |
Holden Mine Unilateral Adminstrative Order | 7/12/2012 | Enforcement Order |
Holden Mine ROD | 1/1/2012 | EPA Record of Decision |
Holden Mine AOC AO No. 8656 Amendment 2011 | 7/8/2011 | EPA Administrative Order on Consent Amendment |
Holden Mine AOC/AO No. 8133 Amendment | 10/29/2010 | EPA Administrative Order on Consent Amendment |
Holden Mine Administrative Order on Consent No. DE 98TC-C119 | 3/25/1998 | EPA Administrative Order on Consent |
Technical Reports 33
Document Title | Document Date | Document Type |
Holden Mine - ECY Comments on Remedial Action Proposed Plan - Memorandum | 9/5/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Joint CERCLA-MTCA Formal Cleanup - USFS Lead Agency | 9/5/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Ecology Comments on 2025 Five-Year Review - Received on March 27, 2025 | 6/23/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - 5-Year Review - State Interview Questions | 5/12/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Ecology Comments on Draft 2024 ACAR | 3/13/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Ecology Comments on Draft 2025 PSVP Monitoring Activities | 3/13/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Ecology Comments on Draft ACARS Sed Addendum | 2/26/2025 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Biomonitoring Performance Standards Verification 2022 Annual Compliance Assessment Report | 1/1/2023 | Site Specific Technical Document - Other |
Holden Mine - Site Fact Sheet Wetlands East of Tailings Pile 3 | 8/23/2022 | Site Specific Technical Document - Other |
Holden Mine - Site Fact Sheet - Sediment | 8/22/2022 | Site Specific Technical Document - Other |
Holden Mine - PSVP Spring 2021 Event Data Report | 9/1/2021 | Monitoring Report |
Holden Mine - PSVP 2020 ACAR Addendum | 5/1/2021 | Monitoring Report |
Holden Mine - PSVP 2020 Annual Compliance Assessment Report | 2/1/2021 | Monitoring Report |
Holden Mine - Biologically Active Zone Review and Proposal Memorandum | 3/30/2020 | Site Specific Technical Document - Other |
Holden Mine - Work Order # 172 Well Install/Development 2019 | 6/5/2019 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Rio Tinto MW Installation Memo with Errata | 6/4/2019 | Site Specific Technical Document - Other |
Holden Mine Technical Memo Assessment of Hydrogen Sulfide Release from Sodium Hydrosulfide Solutions | 8/1/2017 | Site Specific Technical Document - Other |
Holden Mine UAO Transmittal and Special Notice Waiver | 6/26/2012 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine Agency Comments on 2011 Early Works | 6/7/2011 | Site Specific Technical Document - Other |
Holden Mine 2011 Early Works Implementation Plan | 4/20/2011 | Engineering Design Report |
Holden Mine Addendum to Supplemental Feasibility Study | 6/1/2010 | Feasibility Study |
Holden Mine Agencies’ Comments on Draft Alternative 13M | 6/1/2010 | Site Specific Technical Document - Other |
Holden Mine Proposed Plan | 6/1/2010 | Engineering Design Report |
Holden Mine 2007 FS and 13M transmittal ltr | 3/30/2010 | Feasibility Study |
Holden Mine Alt 13M evaluation rpt | 8/14/2009 | Feasibility Study |
Holden Mine Supplemental Feasability Study | 9/1/2007 | Feasibility Study |
Holden Mine 2007 Agencies Comments on Alt 9 | 8/31/2007 | Feasibility Study |
Holden Mine Alt 9 rpt | 11/18/2005 | Feasibility Study |
Holden Mine 2004 Draft FS | 2/19/2004 | Feasibility Study |
Holden Mine RI rpt | 7/28/1999 | Remedial Investigation Report |
Holden Mine 2007 Agencies Comments on 2004 DFS | 8/31/1997 | Feasibility Study |
Holden Mine SHA Results Notification | 8/31/1990 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Holden Mine - Site Hazard Assessment | 8/1/1990 | Site Hazard Assessment Report |
Natural Resource Damage related documents 1
Document Title | Document Date | Document Type |
Holden Mine Natural Resource Trustee Council Resolution No. 2014-2 | 7/10/2014 | NRDA Legal Document |
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Places to see print documents
-
Central Regional Office1250 W Alder StUnion Gap, 98903-0009Please schedule an appointment to view print documents at this location.
-
Okanogan-Wenatchee National Forest Headquarters215 Melody LnWenatchee, 98801This location may only have print documents available during open comment periods.
Contaminants 1
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | C | S | S | S |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.