Glacier Northwest Inc
Facility Site ID:
23881883
Cleanup Site ID:
599
Site Background
The Glacier Northwest site sits between two other cleanup sites, the Duwamish Shipyard site and North Terminal 115. The cleanups at all of these sites are overseen by Ecology.
Glacier Northwest, Inc. is the current owner of the property that was formerly operated by Reichhold, Inc., a chemical product manufacturer and distributor.
- 1913 to 1922: The upland portion of the property was filled with material from the initial dredging and straightening of the LDW.
- 1936 to 1939: Mineralized-Cell Wood Preserving Company leased a portion of the property from King County and treated logs using a solution that contained copper, arsenic, and zinc on the southern portion of the property.
- 1940 to 1944: Activated charcoal (for use in gas masks) was manufactured and tested by Carlisle Lumber Company and subsequently Crown Zellerbach Corporation under contract to and oversight by the U.S. Army. The Army purchased the upland portion of the property in 1943.
- 1946 to 1961: Reichhold, Inc. leased the land from the Army and used the property for chemical manufacturing, including resins, glues, formaldehyde, pentachlorophenol, and sodium pentachlorophenate at various times during its operations.
- 1964: The Port of Seattle purchased the property and leased it to Kaiser Cement Corp, who was obligated to redevelop the property for storage and distribution of cement. Kaiser redeveloped the property, and the cement storage and distrubtion terminal opened around 1968 or 1969.
- 1968/69 – today: The property has primarily been used as a cement storage and distribution terminal under various property owners and operators, and the southern portion of the property has been intermittently leased for equipment storage to other entities. The property has been owned by Glacier Northwest, Inc. since 1991.
Remedial Investigation: Studying Contamination At The Site
In 2009, we entered into an agreed order with Glacier Northwest, Inc. and Reichhold, Inc. (the potentially liable persons or PLPs) to investigate contamination at the site. This investigation is called a remedial investigation. This investigation found the following primary contaminants of potential concern that may require cleanup:
- Soil: metals (arsenic, copper, zinc, tributyltin), semi-volatile organic compounds (SVOCs - Pentachlorophenol, 2,4,6-trichlorophenol, 2,4-dichlorophenol, hexachlorobenzene, bis(2-ethythexyl) phthalate, phenol), polychlorinated biphenyls (PCBs), dioxins/furans, total petroleum hydrocarbons (TPH) as diesel and/or motor oil, and carcinogenic polycyclic aromatic hydrocarbons (cPAHs)
- Groundwater: metals, SVOCs, PCBs, dioxins/furans, TPH, cPAHs
- Sediments: metals, SVOCs, PCBs, dioxins/furans, TPH, cPAHs
The remedial investigation has a figures section with diagrams mapping where each of these contaminants was found. Each contaminant is displayed on its own figure. These can be found starting on page 37 of the PDF.
Next Steps
The next step in the cleanup process for this site is the creation of a feasibility study which evaluates a range of cleanup options and suggests a preferred way to address the contamination. This document will be released for a public comment period.
Why This Site Matters
This site is along the Lower Duwamish Waterway Superfund Site (LDW), which consists of a 5-mile stretch of the Duwamish River. The EPA added the LDW Superfund site to the Superfund National Priorities List in 2001. Ecology is working to stop or reduce sources of contamination to the LDW Superfund site, an effort known as “source control,” so that the EPA can proceed with the cleanup of the river sediment.
Learn more about the cleanups at the Duwamish Shipyard site and the Port of Seattle North Terminal 115 site by visiting each site's webpage.
Stay informed about all of our work along the Lower Duwamish Waterway by signing up for our monthly newsletter.
Learn more about the cleanups at the Duwamish Shipyard site and the Port of Seattle North Terminal 115 site by visiting each site's webpage.
Stay informed about all of our work along the Lower Duwamish Waterway by signing up for our monthly newsletter.
Documents 33
Legal 3
| Document Title | Document Date | Document Type |
| Glacier Northwest Inc. Final Signed Agreed Order | 7/28/2009 | Agreed Order |
| Glacier Northwest Draft Agreed Order | 5/14/2009 | Agreed Order |
| Glacier Northwest Inc - PLP Letter | 5/6/2008 | Final Potentially Liable Person Status Letter |
Outreach Information 7
| Document Title | Document Date | Document Type |
| Glacier Northwest - RI fact sheet - English | 5/20/2026 | Fact Sheet\Public Notices |
| Glacier Northwest - RI fact sheet - Spanish | 5/20/2026 | Fact Sheet\Public Notices |
| Glacier Northwest - RI fact sheet - Chinese | 5/20/2026 | Fact Sheet\Public Notices |
| Glacier Northwest - RI fact sheet - Vietnamese | 5/20/2026 | Fact Sheet\Public Notices |
| Glacier Northwest - RI fact sheet - Khmer | 5/20/2026 | Fact Sheet\Public Notices |
| Glacier Northwest - Documents ready for public review | 6/16/2009 | Fact Sheet\Public Notices |
| Glacier Northwest Public Participation Plan | 6/1/2009 | Public Participation Plan |
Technical Reports 23
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
Contaminants 9
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Halogenated Organics - Halogenated Organics | B | |||||
| Metals - Metals Priority Pollutants | C | C | B | |||
| Halogenated Organics - Polychlorinated biPhenyls (PCB) | C | S | ||||
| Non-Halogenated Organics - Petroleum Products-Unspecified | C | |||||
| Non-Halogenated Organics - Phenolic Compounds | C | C | C | |||
| Non-Halogenated Organics - Non-Halogenated Solvents | B | |||||
| Halogenated Organics - Dioxins/Furans | C | |||||
| Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | B | |||||
| Metals - Arsenic | C | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.
Public Comment Period
Note: In June, this comment period was extended by one month by request of the Duwamish River Community Coalition and the Duwamish Shipyard team. In July, the Duwamish Shipyard team requested an additional extension to the comment period. This comment period will now end at 11:59 p.m. on Monday, August 17, 2026.
Read the fact sheet
中文信息
Tiếng Việt
Español
ភាសាខ្មែរ
Starting June 1, we invite you to comment on the results of an environmental study describing the contamination found at the Glacier Northwest, Inc. site. The site is along the banks of the Lower Duwamish Waterway (LDW) along W Marginal Way SW and north of the Port of Seattle’s Terminal 115.
The following document is available for review and comment:
Remedial investigation report: An environmental study which finds out what contamination is present and where it has spread to. It helps answer the questions “What contaminants are here?”, “Where exactly are they?”, and “How much is there?”
The main portion of the report is linked above. You may also want to view the other parts of the report in your review: tables, figures, appendix a-j, appendix k-q, appendix r (part 1) (part 2) (part 3) (part 4), appendix s, appendix t-x. Due to file size, appendix y (data tables) is available by request only to Cliff Nale. (This file is approximately 5000MB.)
Submit comments | Read comments
Learn more at our LDW community office hours
Join us at the playground, learn about our work along the Lower Duwamish Waterway, and make a sun print.
Wednesday, June 3, 2026 (4:00 p.m. - 6:00 p.m.)
South Park Playground
738 S Sullivan St., Seattle