Map facility     

A map with the facility/site. Continue on this page to hear information about where the facility/site is located.

Channon Earth Dam & Fish Barrier Passage Barrier Removal
3829 Locker Rd SE Port Orchard WA 98366
GIS latitude:
47.5139537727011
GIS longitude:
-122.557518957167
Ecology region:
NWRO
County:
Kitsap
Location description:
Legislative district:
26
Congressional district:
6
WRIA:
15
Tribal land:
N
Alternate names
Also known as
Channon Dam Removal and Crossing
Channon Earth Dam and Fish Barrier Passage Barrier Removal
Interactions for this facility/site
Interaction Interaction description Ecology program Ecology program contact Program ID Start date End date
SEA Project Site A SEA Project Site is a location where a proposed activity has triggered an Ecology action, on or after January 1, 2004, based on its authority from Section 401 of the Clean Water Act, Coastal Zone Management Act, and/or the State Water Pollution Control Act (90.48 RCW). The activity may be pending or Ecology has taken some action (denied or approved a permit, conducted an enforcement action, etc.). Examples of projects include: commercial, residential, or industrial developments involving fill of wetlands; dredging and other in-water activities; bridge crossings; etc. SEA 360-742-2826
142224 4/14/2023
Construction SW GP General permit issued to owner/operators of construction projects that disturb 1 or more acres of land through clearing, grading, excavating, or stockpiling of fill material that discharge stormwater to state waters. WATQUAL (360) 407-6400
WAR313474 4/5/2024
Non Enforcement Final A Non-Enforcement action (i.e. permit, notice of construction, etc.) was finalized, issued to the respective party, indicating the non-enforcement action was taken. SEA (360) 407-6712
10/4/2023
NAICS codes for this facility
Code Description
SIC codes for this facility
Code Description