Map facility     

A map with the facility/site. Continue on this page to hear information about where the facility/site is located.

Bruce Water System Reservoir No 2 and Distribution System Improvements
Othello WA 99344
GIS latitude:
46.843787
GIS longitude:
-119.043708
Ecology region:
ERO
County:
Adams
Location description:
The work will be located within the Bruce Industrial Park in Othello, WA. Site 1: The new 200,000-gallon reservoir tank will be located 1,500 feet north of the intersection of Lee Rd and Booker Rd, along Booker Rd, then 950 feet east. A 12-inch waterline will run 1,050 feet west from the new reservoir to connect with the existing waterline on the west side of Booker Rd. Additionally, a 10-inch waterline will begin 74 feet west of the reservoir, running south, parallel to the Booker Rd centerline, to Lee Rd. It will then run west along Lee Rd for 840 feet to tie in with the existing waterline at the intersection of Booker Rd and Lee Rd. Site 2: A 16-inch waterline will start at the intersection of Foley Rd and Booker Rd, running south along Booker Rd for 2,500 feet to the North extents of the Bruce Industrial Area. Site 3: Wellhouse improvements for Well No. 2 will be located 1,325 feet north of the intersection of Lee Rd and Water Tower Rd, along Water Tower Rd.
Legislative district:
9
Congressional district:
4
WRIA:
36
Tribal land:
N
Alternate names
Also known as
Bruce Water System Reservoir No 2 and Distribution System Improvements
Interactions for this facility/site
Interaction Interaction description Ecology program Ecology program contact Program ID Start date End date
Construction SW GP General permit issued to owner/operators of construction projects that disturb 1 or more acres of land through clearing, grading, excavating, or stockpiling of fill material that discharge stormwater to state waters. WATQUAL (360) 407-6400
WAR314372 3/12/2025
NAICS codes for this facility
Code Description
SIC codes for this facility
Code Description