US Army Fort Lewis I5 Corridor

Facility Site ID: 38394393 Cleanup Site ID: 1056

What's New?

Last updated April 9, 2018

Two reports are now available. The Draft 2017 Annual Air Sparge and Soil Vapor Extraction System Performance Monitoring Report documents the operation, maintenance, and monitoring for systems that address petroleum contamination and protect indoor air quality in the credit union building. The 2017 Comprehensive Land Use Controls report describes JBLM’s land use controls at restored cleanup sites. Land use controls restrict use, access, or construction at these sites. 

Contamination was from a 300 gallon underground storage tank used to store heating oil. The tank and surrounding soil contaminated with petroleum hydrocarbons were removed in 1996. JBLM has conducted 16 monitoring groundwater at the site using a total of 8 monitoring wells since 2005. 

Site Background

This site has two areas called Miller Hill area and Former Skeet Range. From World War I to the 1960s the Miller Hill area was used for small arms training ranges. Decades of spent bullet slugs and fragments have accumulated in the soil and contaminated it with lead.
 
The former skeet range was used in the 1960s and 1970s. Both sites have high lead levels in soil.

Site Contamination

JBLM environmental staff identified contamination at these two sites.
 
Soils are contaminated with:

  • Petroleum hydrocarbons
  • Volatile organic compounds (VOCs)
  • Lead

The sources of lead are former small arms shooting ranges in the Miller Hill area and a skeet target range are the sources of the lead. JBLM has already conducted testing in these areas and proposes to clean them up by removing and stabilizing lead contaminated soil.

Cleanup

Ecology works to clean up contaminated properties throughout the state. There are several steps in the cleanup process.

A Remedial Investigation (RI) is an in-depth study to:
  • Determine site features such as groundwater flow, sediment type, and other factors.
  • Define the type and extent of contamination.
  • Assess potential effects on human health and the environment.
  • Establish cleanup criteria.
A Feasibility Study (FS):
  • Establishes cleanup criteria.
  • Evaluates cleanup alternatives.
  • Evaluates cost estimates of cleanup alternatives.
A Cleanup Action Plan CAP:
  • Describes the selected cleanup methods.
  • States cleanup standards and other requirements.
Interim Action Plan
In 2012, Ecology approved an Interim Action Work Plan. This plan cleaned up contamination before finalizing the cleanup process. It addressed lead contaminated soils. Cleanup actions included:

  • Digging up and stockpiling contaminated soils at the base of Miller Hill.
  • Treat highly contaminated soil.
  • Haul contaminated soil to active firing ranges for reuse as backstops and berms to catch bullets.
  • Leave contaminated soil in the steepest parts of Miller Hill.
  • Fence off contaminated areas.
  • Replant area with grasses and Oregon White Oaks.

Area of Concern 8-4 meets cleanup levels
In 2017, Ecology agreed with Joint Base Lewis McChord (JBLM) that they can stop monitoring the groundwater at an area that was contaminated with petroleum hydrocarbons. This area, called AOC 8-4, has met the cleanup level for the past 4 semi-annual monitoring events.
 
Ecology also requested that JBLM:

  • Maintain the function and the integrity of the monitoring wells. 
  • Visually inspect the monitoring wells at this site once per year. 
  • Provide a narrative account of the inspections in the groundwater monitoring report for other areas of concern that they submit to Ecology annually.

Ecology may request JBLM to sample the wells at this site at a later date to confirm the groundwater is in compliance with MTCA cleanup levels. 

Legal 2
Document Title Document Date Document Type
First Amendment to Agreed Order No. DE 00HWTRSR-122 with Appendices 3/1/2012 Agreed Order Amendment
Agreed Order No. DE 00HWTRSR-1122 2/23/2001 Agreed Order
Map 2
Document Title Document Date Document Type
Location Map 2/1/2012 Map
Vicinity Map 2/1/2012 Map
State Environmental Policy Act 3
Document Title Document Date Document Type
Determination of Non-Significance 3/1/2012 SEPA Documents
SEPA Environmental Checklist for Former Miller Hill Range 10/24/2011 SEPA Documents
SEPA Environmental Checklist for Skeet Range 10/24/2011 SEPA Documents
Technical Reports 17
Document Title Document Date Document Type
2017 Comprehensive Land Use Controls Plan 1/25/2018 Site Specific Technical Document - other
Draft Annual Air Sparge and Soil Vapor Extraction System Performance Monitoring Report 2017 1/12/2018 Performance/Confirmational Monitoring Plan or Report
Artillery Impact Area and Central Impact Area 11/16/2017 Groundwater Monitoring Report
2017 Air Sparge and Soil Vapor Extraction JBLM Area of Concern 9-2 11/16/2017 Operation and Maintenance Plan
2017 Groundwater Monitoring Plan - Artillery Impact and Central Impact Areas 8/24/2017 Site Specific Technical Document - other
Annual Air Sparge and Soil Vapor Extraction System Performance Monitoring Report 8/2/2017 Site Specific Technical Document - other
2017 Agreed Order Groundwater Monitoring Plan 7/20/2017 Site Specific Technical Document - other
JBLM Groundwater Monitoring Plan 2016 2/23/2017 Performance/Confirmational Monitoring Plan or Report
JBLM Air Sparge and Soil Vapor Extraction System Operations and Maintenance Manual 2/3/2017 Operation and Maintenance Plan
JBLM Groundwater Montoring Report 2014 2/3/2017 Groundwater Monitoring Report
JBLM Groundwater Montoring Report 2015 2/3/2017 Groundwater Monitoring Report
JBLM Groundwater Montoring Report 2016 2/2/2017 Groundwater Monitoring Report
Comprehensive Land Use Controls Plan 12/19/2016 Site Specific Technical Document - other
Air Sparge and Soil Vapor Extraction System Monitoring Report 2015 12/5/2016 Performance/Confirmational Monitoring Plan or Report
Air Sparge and Soil Vapor Extraction System Monitoring Report 2014 7/19/2016 Performance/Confirmational Monitoring Plan or Report
JBLM Groundwater Monitoring Report October 2014-April 2015 11/20/2015 Groundwater Monitoring Report
Agreed Order Interim Action Work Plan 2/1/2012 Interim Action Documents
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 3

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals Priority Pollutants C S
Non-Halogenated Organics - Petroleum Products-Unspecified C S
Other Contaminant - Conventional Contaminants, Organic S S
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.