Facility Site ID: 1257 Cleanup Site ID: 3910

  • Site Status

  • Cleanup Started

Current Status

The Washington Department of Ecology held a public comment period for the Tacoma Metals site between April 27 and May 26, 2020.  No comments were received.  

The Potentially Liable Parties (International Paper, General Metals of Tacoma, the Estate of Sophie Sussman, and Tacoma Metals) will proceed with the following proposed activities:

Write a work plan, and investigate and find cleanup alternatives for:    

•  Soils near the City of Tacoma Right of Way and the former Simpson property. 
•  Soils beneath an area where a former 450,000 gallon above ground storage tank was located and northeast of that area (toward the Puyallup River). 
•  Groundwater beneath the site in the area of City of Tacoma right-of-way and in the northeast portion of the site.

In addition, the Potentially Liable Parties (PLPs) will find out whether contaminated groundwater is moving off the site and impacting the Puyallup River.  

The PLPS will update the 2018 Revised Draft Remedial Investigation and Feasibility Study with the additional data so that Ecology can select a final cleanup remedy for the site and cleanup can move forward.  

Subscribe to the email list for updates to work being done in the Tacoma Tideflats/Commencement Bay area.

Site Background

Tacoma Metals site map (click to enlarge)
Tacoma Metals site map (click to enlarge)
The Tacoma Metals site is located at 1919 Portland Avenue in the Tacoma Tideflats. The site is currently an empty paved lot. 

The following industries operated on the site between the early 1900’s and 1999:

 • Creosoting plant  - 1900s to 1930s

Coke plant - early 1940s

Metals recycling facility - 1950s to 1999


The practices and operations of these industries contaminated soil and groundwater.  In 1988, Ecology ranked the site as a 2 on the Hazardous Sites List.  Site investigations have been ongoing since 1989.  Partial cleanups were conducted in 1989 and again between 2005 and 2007 when unexploded military ordnance and other scrap metal were found during the construction of the Puyallup River side channel.  
Legal 5
Document Title Document Date Document Type
Tacoma Metals - First Amendment to AO 17989 3/30/2021 Agreed Order Amendment
Tacoma Metals Enforcement Order 5/27/2020 Enforcement Order
Tacoma Metals Agreed Order 5/27/2020 Agreed Order
Tacoma Metals- Final PLP 10/19/2018 Final Potentially Liable Person Status Letter
Agreed Order, Tacoma Metals, Inc. Site 1/10/2000 Agreed Order
Public Information 3
Document Title Document Date Document Type
Tacoma Metals Responsiveness Summary 5/31/2020 Responsiveness Summary
Public Participation Plan Tacoma Metals 4/22/2020 Public Participation Plan
Tacoma Metals 4/1/2020 Fact Sheet\Public Notices
Technical Reports 38
Document Title Document Date Document Type
Tacoma Metals - Notification of Project Coordinator Designation 3/7/2024 Site Specific Administrative Document - other (Administrative correspondence)
Ecology Comments 12/19/2023 Remedial Investigation / Feasibility Study
Pilot-Scale Treatability Study Implementation Report 12/29/2022 Site Specific Technical Document - other
Additional Site Characterization and Pilot Scale Testing Plan 12/7/2021 Remedial Investigation Work Plan
Technical Memorandum TCLP Test Results 8/17/2020 Site Specific Technical Document - other
Final Supplemental Remedial Investigation/Feasibility Study Work Plan 7/17/2020 Remedial Investigation Work Plan
Former Tacoma Metals - ECY Comments on Revised Draft RIFS 12/3/2018 Site Specific Administrative Document - other (Administrative correspondence)
Tacoma Metals Change of Project Coordinator Designation 10/18/2018 Site Specific Administrative Document - other (Administrative correspondence)
Contacts-Tacoma Metals 9/24/2018 Site Specific Administrative Document - other (Administrative correspondence)
Ecology Comments on IAWP 9/10/2018 Site Specific Administrative Document - other (Administrative correspondence)
Appendix C TacomaMetalsInc_Revised Draft RIFS 6/22/2018 Remedial Investigation / Feasibility Study
Appendix B TacomaMetalsInc_Revised Draft RIFS 6/22/2018 Remedial Investigation / Feasibility Study
Appendix A TacomaMetalsInc_Revised Draft RIFS 6/22/2018 Remedial Investigation / Feasibility Study
Revised Draft Remedial Investigation and Feasibility Study, Tacoma Metals, Inc. Site 6/22/2018 Remedial Investigation / Feasibility Study
Ecology Comments on Draft RI-FS 4/26/2018 Remedial Investigation / Feasibility Study
2017.09.19_ECY Comments on Draft IAWP 9/19/2017 Site Specific Administrative Document - other (Administrative correspondence)
Targeted Groundwater Monitoring Results, Former Tacoma Metals Site 9/15/2017 Groundwater Monitoring Report
Focused Groundwater Monitoring Results 3/21/2017 Groundwater Monitoring Report
Ecology Comments on the Feasibility Study Addendum, B-36 Area, Tacoma Metals Site 4/21/2016 Site Specific Technical Document - other
Ecology Comments on the Revised Augmented Remedial Investigation and Feasibility Study Report dated September 2014 4/18/2016 Site Specific Technical Document - other
Appendices D-E, Feasibility Study Addendum, B-36 Area, Tacoma Metals Site 6/30/2015 Feasibility Study
Appendices A-C, Feasibility Study Addendum, B-36 Area, Tacoma Metals Site 6/30/2015 Feasibility Study
Feasibility Study Addendum, B-36 Area, Tacoma Metals Site 6/30/2015 Feasibility Study
Revised Augmented Remedial Investigation and Feasibility Report, Former Tacoma Metals Site, Tacoma, Washington 9/1/2014 Remedial Investigation / Feasibility Study
Response to Comments Provided in Ecology's January 2014 Letter, Augmented Remedial Investigation and Feasibility Study Report 4/30/2014 Remedial Investigation Report
Transmittal of Ecology Response to International Paper Responses to Ecology Responses to RI-FS Comments, dated August 7, 2013, prepared by URS Corp. 1/6/2014 Site Specific Administrative Document - other (Administrative correspondence)
Response to Comments Provided in Ecology's 22 April 2013 Letter, Augmented Remedial Investigation and Feasibility Study Report, Former Tacoma Metals Site 6/18/2013 Site Specific Technical Document - other
International Paper Company Comments, Draft Augmented RI/FS Report, Former Tacoma Metals Facility 3/11/2013 Site Specific Technical Document - other
Groundwater Investigation Work Plan, Puyallup River Side Channel Investigation, Former Tacoma Metals Facility 4/27/2010 Site Specific Technical Document - other
Response to Ecology Comments, Forensic Evaluation of Hydrocarbons 2/17/2009 Site Specific Technical Document - other
Soil and Groundwater Investigation Results - Data Transmittal, October 2007 - April 2008 Investigation, Former Tacoma Metals Facility 7/21/2008 Site Specific Technical Document - other
Revised Work Plan for Treating Lead-Containing Soil Materials, Former Tacoma Metals Site 6/26/2007 Site Specific Technical Document - other
Cleanup Level Evaluation 6/4/2007 Site Specific Technical Document - other
Friedman & Bruya Data Review 1/19/2007 Site Specific Technical Document - other
Thea Foss and Wheeler-Osgood Waterways Remediation Project 9/1/2006 Site Specific Technical Document - other
Final Letter Report for UXO Investigation Services at Former Tacoma Metals Site 7/12/2006 Site Specific Technical Document - other
Soil and Groundwater Quality Testing Results, Puyallup River Side Channel and Tacoma Metals Site 8/7/2003 Site Specific Technical Document - other
Limited Phase II Environmental Assessment, Tacoma Metals, Inc. 9/11/1990 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 7

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals Priority Pollutants C C S
Metals - Metals - Other C C
Halogenated Organics - Polychlorinated biPhenyls (PCB) C B B
Non-Halogenated Organics - Petroleum Products-Unspecified C C
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons C C S
Reactive Wastes - UnExploded Ordnance R
Non-Halogenated Organics - Other Non-Halogenated Organics S
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.