East Bay Redevelopment

Facility Site ID: 5785176 Cleanup Site ID: 407

Cleanup Construction Is Nearly Complete

Ecology is currently reviewing the cleanup construction reports. We are also reviewing several  environmental covenants that are needed. We will continue to monitor the soil cover and pavement caps to make sure that they continue to protect human health and the environment.  Any new activity that disturbs the cap (like constructing a building) will require Ecology’s review and approval. We will update this website with any changes to the cleanup legal agreement (agreed order).

For more information about the cleanup click the factsheet link below.

Site Description And History

From the late 1880s until 1968, the site was used for timber-related industries. Since then, the site has been used for commercial and light industrial activities and storage. Previous users included a sawmill, planing mill, shingle mill, and plywood manufacturers.

Historic activities caused soil and groundwater contamination. Total petroleum hydrocarbons (TPHs), carcinogenic polycyclic aromatic hydrocarbons, dioxins and furans, and metals were detected above state cleanup levels in soil. Investigations also revealed TPHs and metals in groundwater above state cleanup levels or screening levels.

The Port of Olympia (port) entered the Voluntary Cleanup Program in January 2007.  The site was transferred to a formal cleanup process in February 2008. 

In June 2010, LOTT Cleanup Water Alliance (LOTT) and the City of Olympia (city) purchased two parcels that are part of the East Bay site.  The city, LOTT, and the port are now all responsible for the cleanup of the East Bay Redevelopment site.  All three parties entered into a legal agreement (Agreed Order) to continue with site work. 

From 2009-2012, two partial cleanups (interim actions) were done to remove and contain contaminated soil on the southern half of the site. We conducted this cleanup during infrastructure construction of the Hands On Children's Museum, the LOTT and East Bay public plazas, and associated roads.

In 2017, Ecology worked with the City of Olympia, the Port of Olympia, and LOTT to implement the Cleanup Action Plan for the site. To clean up the site, some soil contamination hot spots were removed. Contaminated soil that remained was covered with a cap of clean soil, pavement, or buildings. Tests showed that the groundwater is no longer contaminated.

Public Involvement Opportunities

Ecology wants to keep you involved!  You will have the chance to review and comment on key documents during the investigation process.  Documents will be at this web site as they become available.

Site use restrictions called institutional controls are in effect

Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.

Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.

Environmental Covenant

County Recording #: 4659380
County Recording Date: 11/27/2018

Restrictions/Requirements

  • Control Stormwater
  • Ongoing Maintenance of Remedy
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil

Environmental Covenant

County Recording #: 4659381
County Recording Date: 11/27/2018

Restrictions/Requirements

  • Control Stormwater
  • Ongoing Maintenance of Remedy
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Domestic Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil

Environmental Covenant

County Recording #: 5007920
County Recording Date: 3/8/2024

Restrictions/Requirements

  • Control Stormwater
  • Ongoing Maintenance of Remedy
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil

Environmental Covenant

County Recording #: 5007921
County Recording Date: 3/8/2024

Restrictions/Requirements

  • Control Stormwater
  • Ongoing Maintenance of Remedy
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil

Environmental Covenant

County Recording #: 5009403
County Recording Date: 3/22/2024

Restrictions/Requirements

  • Control Stormwater
  • Ongoing Maintenance of Remedy
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil
Legal 10
Document Title Document Date Document Type
East Bay Redevelopment, Lots 1, 6, and 7 Covenant 3/22/2024 Environmental Covenant; Alternative Mechanism
East Bay Redevelopment, Lot 4 Covenant 3/8/2024 Environmental Covenant; Alternative Mechanism
East Bay Redevelopment, Lot 5 Covenant 3/8/2024 Environmental Covenant; Alternative Mechanism
East Bay Redevelopment, Lot 9 Covenant 11/27/2018 Environmental Covenant; Alternative Mechanism
East Bay Redevelopment, Lots 10, 11, and 12 Covenant 11/27/2018 Environmental Covenant; Alternative Mechanism
Ecology signature page to Agreed Order Amendment 5/10/2018 Agreed Order Amendment
Amendment to East Bay Agreed Order DE 14072 1/30/2018 Agreed Order Amendment
East Bay Redevelopment Agreed Order DE 14072 4/13/2017 Agreed Order
East Bay Redevelopment Agreed Order DE 7830 Scanned Original Copy 9/1/2010 Agreed Order
East Bay Redevelopment Agreed Order 10/3/2008 Agreed Order
Public Information 10
State Environmental Policy Act 6
Document Title Document Date Document Type
East Bay Redevelopment_Amended SEPA DNS 2/15/2018 SEPA Documents
Approval of Amended SEPA DNS 2/15/2018 SEPA Documents
SEPA Determination and Checklist 2017 4/13/2017 SEPA Documents
East Bay Redevelopment Parcels 4 and 5 Interim Action SEPA DNS and Checklist 6/23/2010 SEPA Documents
East Bay Redevelopment SEPA DNS 3/16/2009 SEPA Documents
East Bay Redevelopment SEPA Checklist 2/1/2009 SEPA Documents
Technical Reports 51
Document Title Document Date Document Type
East Bay Lot 1, 6, 7 - Transmittal of Signed EC 2/9/2024 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Lot 5 - EC 1/17/2024 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Lot 4 - EC 1/17/2024 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Lot 11 Cleanup Action Plan 11/27/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Cleanup Action Completion Report Approval 11/27/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - O & M Plan Approval 11/27/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App D-H, part 9 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 8 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 7 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lott 11 Cleanup Action Completion Report, App C, part 6 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 5 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 4 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 3 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, App C, part 2 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Lot 11 Cleanup Action Completion Report, text-figs-tables-App A and B, part 1 of 9 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App F-App M, part 7 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App B-App E, part 6 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App B, part 5 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App B, Part 4 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App B, part 3 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, App B, Part 2 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Cleanup Action Completion Report, Text-Figs-Tables-App A-App B part 1 of 7 9/1/2023 Final Cleanup Action Report
East Bay Redevelopment - Operations & Maintenance Plan 9/1/2023 Operation and Maintenance Plan
East Bay Redevelopment - Comments on 2022 Annual Inspection Report 8/7/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Comments on Lot 11 Cleanup Action Completion Report 8/7/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Comments on Long-Term Operations & Maintenance plan 8/3/2023 Operation and Maintenance Plan
East Bay Redevelopment - Comments on Cleanup Action Completion Report 8/3/2023 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Environmental Covenant Request 11/9/2021 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Cleanup Site Manager Change Letter 10/15/2021 Site Specific Administrative Document - other (Administrative correspondence)
Operating and Maintenance Plan 11/7/2018 Operation and Maintenance Plan
Ecology Comments on the Long-Term O&M Plan 9/17/2018 Site Specific Administrative Document - other (Administrative correspondence)
EastBay EDR Approval - July 2018 7/3/2018 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment - Engineering Design Report (Lot 11) 6/25/2018 Engineering Design Report
Unanticipated Discoveries Plan, Addendum to the Engineering Desgin Report for the East Bay Redevelopment Site 8/14/2017 Engineering Design Report
East Bay Redevelopment - Engineering Design Report for Cleanup Implementation 6/1/2017 Engineering Design Report
RI/FS Appendices F through O, East Bay Redevelopment Site 12/1/2016 Remedial Investigation / Feasibility Study
RI/FS Appendices D and E, East Bay Redevelopment Site 12/1/2016 Remedial Investigation / Feasibility Study
RI/FS Appendices A through C, East Bay Redevelopment Site 12/1/2016 Remedial Investigation / Feasibility Study
Remedial Investigation/Feasibility Study Report, East Bay Redevelopment Site, Olympia, WA 12/1/2016 Remedial Investigation / Feasibility Study
Parcel 4/Parcel 5 Interim Action Report 2/23/2015 Interim Action Documents
East Bay Redevelopment Site Data Gap Investigation Work Plan and Schedule 10/7/2011 Remedial Investigation Work Plan
East Bay Redevelopment Infrastructure Interim Action Report Appendix G 6/30/2010 Interim Action Documents
East Bay Redevelopment Infrastructure Interim Action Report Body through Appendix F 6/30/2010 Interim Action Documents
East Bay Redevelopment Interim Action Work Plan 6/23/2010 Interim Action Documents
Artesian Well Decommissioning Work Plan 5/4/2009 Site Specific Technical Document - other
Geotechnical Report, Hands on Children's Museum, Olympia, Washington 3/19/2009 Site Specific Technical Document - other
East Bay Redevelopment Interim Action Work Plan 3/1/2009 Interim Action Documents
Notice of Penalty Incurred and due No. 6186 11/25/2008 Site Specific Administrative Document - other (Administrative correspondence)
East Bay Redevelopment Remedial Investigation Work Plan 10/22/2008 Remedial Investigation Work Plan
East Bay Redevelopment - Site Hazard Assessment 7/24/2008 Site Hazard Assessment Report
Specifications for East Bay Marina, Phase One Construction of Retention Dikes for the Port of Olympia 4/1/1981 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 11

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals Priority Pollutants RB
Metals - Metals - Other B
Halogenated Organics - Polychlorinated biPhenyls (PCB) B B
Non-Halogenated Organics - Petroleum Products-Unspecified RB B
Non-Halogenated Organics - Phenolic Compounds B
Halogenated Organics - Dioxins/Furans RB
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons RB B
Metals - Arsenic B
Metals - Lead B
Halogenated Organics - Other Halogenated Organics B
Non-Halogenated Organics - Other Non-Halogenated Organics B
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.