Centralia Landfill
Third Periodic Review Completed
Environmental cleanup is complete at the site and the third periodic review shows the cleanup work remains effective in protecting the health of people and the environment.
The site is a closed municipal solid waste landfill. The cleanup action involved containment of hazardous materials typical of municipal solid waste landfills. Because hazardous material was left in place at the site, an environmental covenant was filed with the county in 2001.
When an environmental covenant exists for a cleanup site, Ecology reviews site conditions about every five years to ensure the long-term effectiveness of the cleanup action. Ecology inspected the site on September 1, 2020. The current condition of the landfill cover appears in good condition. Site personnel regularly maintain installations at the the Site, control vegetation on the landfill cap surface, and maintain fencing and security. Groundwater and surface water conditions are monitored regularly, and landfill-generated gas (methane) is collected and destroyed.
Institutional controls continue to eliminate possible exposure of people and the environment to the contained waste and contaminated groundwater.
From April 22 to May 23, 2021, Ecology held a comment period to give the public an opportunity to comment on conditions at the site. No comments were received and Ecology finalized the third periodic review report.
Third Periodic Report - Final
Site Description
Site Cleanup
In October 1985, Ecology conducted a preliminary evaluation of the landfill in conjunction with the U.S. Environmental Protection Agency (EPA). The landfill was determined to be a hazardous waste site. In 1990, it was placed on the federal National Priorities List and the Washington State Hazardous Sites List. The Hazardous Site List is a statewide list of contaminated properties. Ecology was designated the lead agency for site cleanup.
In 1994, Ecology and the Centralia Landfill Closure Group (a group of potentially liable persons) entered into a consent decree (legal agreement) to cleanup the site. A multi-layer cover system was placed on the landfill. The cover prevents stormwater from seeping into the buried material. The cover also directs clean surface water runoff into a wetland mitigation area south of the landfill.
A permanent landfill gas collection system was installed to collect gas being generated beneath the landfill cover. Decomposition of landfill material can give rise to methane gas. The gas must be collected and destroyed because it burns easily. To destroy the methane, a gas flare system was installed adjacent to the landfill entrance. Gas probes located along the collection system monitor the amount of gas being produced.
Groundwater monitoring wells were installed up- and down-gradient of the covered landfill area to monitor metal concentrations and other water quality conditions.
A surface water sampling station is located downgradient of the covered landfill area to monitor the condition of the water exiting the site.
Fencing was installed around the site to prevent anyone from making unauthorized entry to the landfill.
The property owner is required to continue monitoring groundwater, surface water, and landfill gas as described in the updated Centralia Landfill 2020 Compliance Groundwater Monitoring Plan.
Groundwater cleanup levels have not been met at the site. But the cleanup complies with cleanup standards because the long-term integrity of the containment has been met.
The remedy at the Centralia Landfill is considered protective of human health and the environment because the solid waste has been contained, landfill gas is collected and controlled, and surface water and groundwater are protected and monitored.
Environmental Covenant
An environmental covenant was recorded for the site in 2001. The covenant requires maintaining integrity of the cap covering buried landfill material and fencing to restrict public access to the site.
The covenant prohibits:
- Activities that will result in the release of contaminants contained as part of the cleanup without Ecology's approval.
- Restricts groundwater for any use other than for compliance monitoring.
- Any use of the property that is inconsistent with the covenant.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 3
Environmental Covenant
Restrictions/Requirements
- Ongoing Maintenance of Remedy
- Prohibit Soil Disturbance
- Restrict All Ground Water Extraction/Well Installation
- Restrict Land Use
- Restrictive Signage
Restricted Media
- Groundwater
- Soil
Environmental Covenant
Restrictions/Requirements
- Prevent the Reuse or Relocation of Site Soil
- Prohibit New Building Construction
- Prohibit Removal or Alteration of Existing Buildings
- Prohibit Soil Disturbance
- Restrict All Ground Water Extraction/Well Installation
- Restrict Domestic Ground Water Extraction/Well Installation
- Restrict Land Use
Restricted Media
- Groundwater
- Soil
Environmental Covenant
Restrictions/Requirements
- Prevent the Reuse or Relocation of Site Soil
- Prohibit Soil Disturbance
- Restrict All Ground Water Extraction/Well Installation
- Restrict Land Use
- Restrict Surface Water Use
Restricted Media
- Groundwater
- Soil
- Surface Water
Documents 39
Legal 11
Document Title | Document Date | Document Type |
Fiancial assurance letter | 12/12/2019 | Financial Assurance |
Centralia Landfill Stipulated Amendment to Interim Action Consent Decree | 3/25/2013 | Consent Decree - Amendment |
Centralia Landfill Restrictive Covenant | 8/5/2010 | Environmental Covenant; Alternative Mechanism |
Legal Description | 12/10/2001 | Environmental Covenant; Alternative Mechanism |
Consent Decree Cleanup Action Plan May 2001 | 5/22/2001 | Consent Decree |
Centralia Landfill Cleanup Action Plan Consent Decree | 4/25/2001 | Consent Decree |
Restrictive Covenant | 3/10/2001 | Environmental Covenant; Alternative Mechanism |
Centralia Landfill Consent Decree for a Remedial Investigation/Feasibility Study | 3/15/1993 | Consent Decree |
Centralia Landfill Affidavit of Lucy Phillips | 7/9/1991 | Affidavit |
Centralia Landfill Consent Decree | 7/8/1991 | Consent Decree |
Centralia Landfill Consent Decree | 4/29/1991 | Consent Decree |
Public Information 2
Document Title | Document Date | Document Type |
Centralia Landfill Third Periodic Review Responsiveness Summary (no comments) | 5/25/2021 | Responsiveness Summary |
Centralia Landfill Responsiveness Summary | 11/1/2010 | Responsiveness Summary |
Technical Reports 26
Document Title | Document Date | Document Type |
Groundwater Monitoring Data Statistical Evaluation | 12/1/2022 | Site Specific Technical Document - other |
2021 Compliance Monitoring Report | 9/1/2022 | Groundwater Monitoring Report |
Centralia Landfill - Notice of Periodic Review | 5/26/2021 | Periodic Review (5 Year) |
Centralia Landfill Third Periodic Review Report - Final | 5/25/2021 | Periodic Review (5 Year) |
2020 Annual Monitoring Report | 4/16/2021 | Performance/Confirmational Monitoring Plan or Report |
Cetralia Landfill - 2020 Compliance Monitoring Report | 4/14/2021 | Groundwater Monitoring Report |
2020 Updated Landfill Monitoring Plan | 11/5/2020 | Performance/Confirmational Monitoring Plan or Report |
Q1 and Q3 2019 Landfill Monitoring Report | 4/1/2020 | Performance/Confirmational Monitoring Plan or Report |
1rd quarter Lanfill monitoring Report | 11/15/2018 | Performance/Confirmational Monitoring Plan or Report |
3rd quarter Landfill Monitoring Report | 11/9/2017 | Performance/Confirmational Monitoring Plan or Report |
1st half 2017 Landfill Monitoring Report | 6/13/2017 | Performance/Confirmational Monitoring Plan or Report |
Dry season 2016 Landfill Monitoring Report | 11/28/2016 | Performance/Confirmational Monitoring Plan or Report |
Compliance Monitoring Report for Wet Season | 6/28/2016 | Performance/Confirmational Monitoring Plan or Report |
2015 Dry Season Monitoring Report | 1/25/2016 | Performance/Confirmational Monitoring Plan or Report |
Centralia Landfill Periodic Review Report-Final | 1/8/2016 | Periodic Review (5 Year) |
March 2015 Landfill Monitoring Report | 4/14/2015 | Performance/Confirmational Monitoring Plan or Report |
2014 Second half Landfill Monitoring Report | 12/3/2014 | Performance/Confirmational Monitoring Plan or Report |
2014 Wet Season Monitoring Report | 6/11/2014 | Performance/Confirmational Monitoring Plan or Report |
Second Quarter 2013 Landfill Monitoring Report | 12/19/2013 | Performance/Confirmational Monitoring Plan or Report |
Compliance Monitoring for first half of 2013 | 6/14/2013 | Performance/Confirmational Monitoring Plan or Report |
Second Quarter of 2012 Landfill Monitoring Report | 2/6/2013 | Performance/Confirmational Monitoring Plan or Report |
Compliance Monitoring Report for first Quarter of 2012 | 9/27/2012 | Performance/Confirmational Monitoring Plan or Report |
Compliance monitoring report for the Centralia Landfill for second half of 2011 | 1/31/2012 | Performance/Confirmational Monitoring Plan or Report |
Centralia Landfill 2010 Periodic Review | 11/30/2010 | Periodic Review (5 Year) |
Cleanup Action Plan | 12/30/2002 | Cleanup Action Plan |
Compliance Monitoring Plan | 11/1/1999 | Performance/Confirmational Monitoring Plan or Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 5
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | C | C | ||||
Metals - Metals - Other | C | |||||
Halogenated Organics - Polychlorinated biPhenyls (PCB) | S | |||||
Other Contaminant - Conventional Contaminants, Organic | C | |||||
Other Contaminant - Conventional Contaminants, Inorganic | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated