The Gig Harbor Sportsman’s Club is an active shooting range. It has operated on the 35 acre property since the 1940’s. The facility currently contains a shotgun range, including seven trap fields, and a 100-yard combination rifle and pistol range.
The Gig Harbor Sportsman’s Club has a small un-named creek flowing across the property. In 2002, The Tacoma-Pierce County Health Department (TPCHD) conducted an initial investigation. They found water samples with lead above the state cleanup level in the creek. Ecology sampled in 2008 and found similar results. The un-named creek flows into North Creek which is a salmon-bearing stream. North Creek continues to flow through the city of Gig Harbor and into Puget Sound.
The Gig Harbor Sportsman’s Club has a small un-named creek flowing across the property. In 2002, The Tacoma-Pierce County Health Department (TPCHD) conducted an initial investigation. They found water samples with lead above the state cleanup level in the creek. Ecology sampled in 2008 and found similar results. The un-named creek flows into North Creek which is a salmon-bearing stream. North Creek continues to flow through the city of Gig Harbor and into Puget Sound.
Documents 12
Legal 3
Document Title | Document Date | Document Type |
Agreed Order No. DE 12803 | 11/10/2015 | Agreed Order |
Final PLP Determination Letter - GHSC | 2/13/2015 | Final Potentially Liable Person Status Letter |
Preliminary PLP Determination Letter - GHSC | 11/25/2014 | Final Potentially Liable Person Status Letter |
Outreach Information 2
Document Title | Document Date | Document Type |
Fact Sheet - Agreed Order No. DE 12803 | 9/14/2015 | Fact Sheet\Public Notices |
Public Participation Plan - September 2015 | 9/3/2015 | Public Participation Plan |
Technical Reports 7
Document Title | Document Date | Document Type |
Data Gap Investigation Work Plan | 1/27/2021 | Remedial Investigation Work Plan |
NET ENVIRONMENTAL BENEFIT ANALYSIS | 12/17/2019 | Site Specific Technical Document - other |
Final RIFS Work Plan Addendum No. 2 | 7/5/2018 | Remedial Investigation Work Plan |
Final RIFS Work Plan Addendum | 12/22/2016 | Remedial Investigation Work Plan |
Final RIFS Work Plan | 8/30/2016 | Remedial Investigation Work Plan |
Gig harbor Sportsman Club - Site Hazard Assessment | 2/1/2010 | Site Hazard Assessment Report |
Gig Harbor Sportsman Club - Site Hazard Assessment | 11/17/2009 | Site Hazard Assessment Report |
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 3
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals - Other | C | S | C | C | ||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | S | S | C | ||
Metals - Lead | C | S | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.