Violation Details
                                                               
------------------------------------------------------
Facility Name:KALAMA STP
Permit:WA0020320
Category:Exceedance of Design Criteria
Type:Design Criteria Exceedance
Date: 12/1/2015
-
Notes: December 2015 - 85% Design Exceedance for Flow AVG and Design Exceedance for Flow MAX: Storm related
---------------------------------------------------------
Monitoring Data
Parameter :Flow
Fraction:Not Applicable
Units:Million Gallons/Day (MGD)
Statistical Base:Maximum
Sample Type: Recorded
Non Report Reason:-
BenchMark Min:-   Max:-
Limit Min:-   Max:-
Design: 1.72
Design Warning:1.462
Value:2.818
Violation Override: -
----------------------------------------------------
Related Enforcements
Enforcement ActionStatusDatePenalty AmountNotes
No enforcement action necessary Complete2/12/2016 December 2015 - 85% Design Exceedance for Flow AVG and Design Exceedance for Flow MAX: Storm related
  • NoFilter
  • Contains
  • DoesNotContain
  • StartsWith
  • EndsWith
  • EqualTo
  • NotEqualTo
  • GreaterThan
  • LessThan
  • GreaterThanOrEqualTo
  • LessThanOrEqualTo
  • Between
  • NotBetween
  • IsEmpty
  • NotIsEmpty
  • IsNull
  • NotIsNull
  • Custom

The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.