Violation Details
                                                               
------------------------------------------------------
Facility Name:
PSE GOLDENDALE
Permit:
WAR004405
Category:
Failure to submit required report (non-DMR, non-pretreatment)
Type:
Reporting Violations
Date:
7/19/2019
-
Notes:
Auto-generated late/missing submittal
---------------------------------------------------------
Monitoring Data
Parameter :
-
Fraction:
-
Units:
-
Statistical Base:
-
Sample Type:
-
Non Report Reason:
-
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
-
Violation Override:
-
----------------------------------------------------
Related Enforcements
Enforcement Action
Status
Date
Penalty Amount
Notes
Informal Action - Meeting
Complete
10/9/2019
July/August DMR Violation Meeting was held on OCT 9, 2019. A chiller tripped and before the backup could be switched on the facility discharged warm wastewater. Issue has been addressed.
NoFilter
Contains
DoesNotContain
StartsWith
EndsWith
EqualTo
NotEqualTo
GreaterThan
LessThan
GreaterThanOrEqualTo
LessThanOrEqualTo
Between
NotBetween
IsEmpty
NotIsEmpty
IsNull
NotIsNull
Custom
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.