Violation Details
                                                               
------------------------------------------------------
Facility Name:
BREMERTON STP
Permit:
WA0029289
Category:
Failure to submit required report (non-DMR, non-pretreatment)
Type:
Reporting Violations
Date:
2/7/2020
-
Notes:
Onstad: Not a violation. This submittal is in Version 4 of the submittal due 1/15/20. However, it is for the 2020 1st quarter monitoring period. It should be submitted under the submittal due of 4/15/20.
---------------------------------------------------------
Monitoring Data
Parameter :
-
Fraction:
-
Units:
-
Statistical Base:
-
Sample Type:
-
Non Report Reason:
-
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
-
Violation Override:
Permit defined exception/exemption
----------------------------------------------------
Related Enforcements
Enforcement Action
Status
Date
Penalty Amount
Notes
No enforcement action necessary
Complete
4/23/2020
NFA at this time. Reports submitted late or on time.
NoFilter
Contains
DoesNotContain
StartsWith
EndsWith
EqualTo
NotEqualTo
GreaterThan
LessThan
GreaterThanOrEqualTo
LessThanOrEqualTo
Between
NotBetween
IsEmpty
NotIsEmpty
IsNull
NotIsNull
Custom
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.