Violation Details
                                                               
------------------------------------------------------
Facility Name:
King County Vashon WWTP
Permit:
WA0022527
Category:
Failure to submit required report (non-DMR, non-pretreatment)
Type:
Reporting Violations
Date:
5/3/2021
-
Notes:
Auto-generated late/missing submittal. McKone: No violation. King County submitted the pretreatment annual report for all of their facilities on March 24, 2021. Although Ecology manually logged this in as received for Vashon, the permittee logged a new submittal after the due date.
---------------------------------------------------------
Monitoring Data
Parameter :
-
Fraction:
-
Units:
-
Statistical Base:
-
Sample Type:
-
Non Report Reason:
-
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
-
Violation Override:
-
----------------------------------------------------
Related Enforcements
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.