Violation Details
                                                               
------------------------------------------------------
Facility Name:
BREMERTON STP
Permit:
WAG994550
Category:
Analysis not Conducted
Type:
Monitoring Violations
Date:
4/26/2022
-
Notes:
Leung: The permittee received sampling results late from the contract lab which had instrumentation issues and delay in completing sample analysis (nitrate+nitrite). This also affected other data calculations and reporting on the DMR. The permittee submitted a revised DMR as soon as they received the sampling results from the contract lab. The permittee notified this to Ecology in advance.
---------------------------------------------------------
Monitoring Data
Parameter :
Nitrogen (calculation)
Fraction:
Total Inorganic (NH3 + NO3 + NO2)
Units:
Milligrams/L (mg/L)
Statistical Base:
Single Sample (Main DMR Grid)
Sample Type:
Calculated
Non Report Reason:
Failed to Sample/Required Analysis Not Conducted
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
-
Violation Override:
-
----------------------------------------------------
Related Enforcements
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.