Violation Details
                                                               
------------------------------------------------------
Facility Name:
BP CHERRY POINT REFINERY
Permit:
WA0022900
Category:
Analysis not Conducted
Type:
Monitoring Violations
Date:
1/3/2023
-
Notes:
---------------------------------------------------------
Monitoring Data
Parameter :
Nitrogen, Kjeldahl Dissolved (As N)
Fraction:
Not Applicable
Units:
Milligrams/L (mg/L)
Statistical Base:
Single Sample (Main DMR Grid)
Sample Type:
Composite sample (24 hour)
Non Report Reason:
Failed to Sample/Required Analysis Not Conducted
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
-
Violation Override:
-
----------------------------------------------------
Related Enforcements
Enforcement Action
Status
Date
Penalty Amount
Notes
Informal Action - Email
Complete
4/4/2023
Ecology's response to the violations for not submitting the dissolved total phosphorus and dissolved TKN results for January 2023. Ecology will take no further action with regard to these violations at this time. However, if similar violations continue, Ecology will consider formal enforcement action.
NoFilter
Contains
DoesNotContain
StartsWith
EndsWith
EqualTo
NotEqualTo
GreaterThan
LessThan
GreaterThanOrEqualTo
LessThanOrEqualTo
Between
NotBetween
IsEmpty
NotIsEmpty
IsNull
NotIsNull
Custom
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.