Violation Details
                                                               
------------------------------------------------------
Facility Name:BP CHERRY POINT REFINERY
Permit:WA0022900
Category:Warning Limit Exceedance
Type:Warning Limit Exceedance
Date: 12/27/2022
-
Notes:
---------------------------------------------------------
Monitoring Data
Parameter :Solids (Residue)
Fraction:Total suspended (TSS)
Units:Lbs/Day
Statistical Base:Single Sample (Main DMR Grid)
Sample Type: Composite - 24 HR Time
Non Report Reason:-
BenchMark Min:-   Max:-
Limit Min:-   Max:1570
Design: -
Design Warning:-
Value:1638
Violation Override: -
----------------------------------------------------
Related Enforcements
Enforcement ActionStatusDatePenalty AmountNotes
No enforcement action necessary Complete3/27/2023 Stormwater allocation was used to calculate Total Suspended Solids (TSS) through Outfall 001 on December 25th and December 27th. The calculations determined the Maximum Daily TSS discharge limit allowed for the dates mentioned above were higher than the reported Maximum daily discharge.
  • NoFilter
  • Contains
  • DoesNotContain
  • StartsWith
  • EndsWith
  • EqualTo
  • NotEqualTo
  • GreaterThan
  • LessThan
  • GreaterThanOrEqualTo
  • LessThanOrEqualTo
  • Between
  • NotBetween
  • IsEmpty
  • NotIsEmpty
  • IsNull
  • NotIsNull
  • Custom

The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.