Facility Name:
BP CHERRY POINT REFINERY
Permit:
WA0022900
Category:
Warning Limit Exceedance
Type:
Warning Limit Exceedance
Date:
12/27/2022
-
Notes:
---------------------------------------------------------
Monitoring Data
Parameter :
Solids (Residue)
Fraction:
Total suspended (TSS)
Units:
Lbs/Day
Statistical Base:
Single Sample (Main DMR Grid)
Sample Type:
Composite - 24 HR Time
Non Report Reason:
-
BenchMark Min:
-
  Max:
-
Limit Min:
-
  Max:
1570
Design:
-
Design Warning:
-
Value:
1638
Violation Override:
-
----------------------------------------------------
Related Enforcements
Enforcement Action
Status
Date
Penalty Amount
Notes
No enforcement action necessary
Complete
3/27/2023
Stormwater allocation was used to calculate Total Suspended Solids (TSS) through Outfall 001 on December 25th and December 27th. The calculations determined the Maximum Daily TSS discharge limit allowed for the dates mentioned above were higher than the reported Maximum daily discharge.
NoFilter
Contains
DoesNotContain
StartsWith
EndsWith
EqualTo
NotEqualTo
GreaterThan
LessThan
GreaterThanOrEqualTo
LessThanOrEqualTo
Between
NotBetween
IsEmpty
NotIsEmpty
IsNull
NotIsNull
Custom
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.