Violation Details
                                                               
------------------------------------------------------
Facility Name:BP CHERRY POINT REFINERY
Permit:WA0022900
Category:Benchmark Exceedance
Type:Benchmark Exceedance
Date: 10/18/2023
-
Notes: Not a violation.
---------------------------------------------------------
Monitoring Data
Parameter :Turbidity (Nephelometric)
Fraction:Measured
Units:NTU
Statistical Base:Single Sample (Main DMR Grid)
Sample Type: Grab
Non Report Reason:-
BenchMark Min:-   Max:25
Limit Min:-   Max:-
Design: -
Design Warning:-
Value:27.7
Violation Override: -
----------------------------------------------------
Related Enforcements
Enforcement ActionStatusDatePenalty AmountNotes
No enforcement action necessary Complete3/4/2024 004 Turbidity benchmark exceedance: Ecology satisfied with BP’s correct action and determined to take no further action, see cover letter and inspection report attached to the 4th Quarter stormwater DMR.
  • NoFilter
  • Contains
  • DoesNotContain
  • StartsWith
  • EndsWith
  • EqualTo
  • NotEqualTo
  • GreaterThan
  • LessThan
  • GreaterThanOrEqualTo
  • LessThanOrEqualTo
  • Between
  • NotBetween
  • IsEmpty
  • NotIsEmpty
  • IsNull
  • NotIsNull
  • Custom

The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.