Violation Details
                                                               
------------------------------------------------------
Facility Name:
BP CHERRY POINT REFINERY
Permit:
WA0022900
Category:
Benchmark Exceedance
Type:
Benchmark Exceedance
Date:
10/18/2023
-
Notes:
Not a violation.
---------------------------------------------------------
Monitoring Data
Parameter :
Turbidity (Nephelometric)
Fraction:
Measured
Units:
NTU
Statistical Base:
Single Sample (Main DMR Grid)
Sample Type:
Grab
Non Report Reason:
-
BenchMark Min:
-
  Max:
25
Limit Min:
-
  Max:
-
Design:
-
Design Warning:
-
Value:
27.7
Violation Override:
-
----------------------------------------------------
Related Enforcements
Enforcement Action
Status
Date
Penalty Amount
Notes
No enforcement action necessary
Complete
3/4/2024
004 Turbidity benchmark exceedance: Ecology satisfied with BP’s correct action and determined to take no further action, see cover letter and inspection report attached to the 4th Quarter stormwater DMR.
NoFilter
Contains
DoesNotContain
StartsWith
EndsWith
EqualTo
NotEqualTo
GreaterThan
LessThan
GreaterThanOrEqualTo
LessThanOrEqualTo
Between
NotBetween
IsEmpty
NotIsEmpty
IsNull
NotIsNull
Custom
The process of tracking how violations and triggers are addressed through the system is new to PARIS. All of the historical violations which were addressed will not have a related enforcement.