| Communication Date | Communication Type | Employee | Communication |
| 6/16/2026 | Email | Lucila Cornejo | Hello Mike and Jake,
I hope you all are having a great day.
Please see the attached letter outlining the implementation of the Sewage Spill Reporting webpage, as required by the 2025 revision to Chapter 90.48 if the Revised Code of Washington (RCW). This letter was created to ensure you are aware of the new legislation and what it means for your facility.
RCW 90.48.636 requires the sewage spill reporting webpage to include specific information that may not be available at the time of the initial report to Ecology or may not be specifically required to be reported by your permit. When information necessary for the Sewage Spill Webpage is not provided to Ecology, we will use our best professional judgement to fill in the blanks if feasible or otherwise will note the information as “unknown” or “not reported.”
You can help ensure that the information we post on the webpage is accurate by including specific details in your incident report and 5-day follow-up report.
The webpage will also identify the permitted facility name associated with the sewage spill report and the county where the spill occurred to help the public identify the area(s) they are interested in. As a result, your facility may receive questions from the public about information on the webpage. We encourage you to view these inquiries as opportunities to help the public understand the practical realities of operating a wastewater collection and/or treatment system, your service goals and, where applicable, information about sewer utility rates.
Thank you,
Lucy |
| 6/16/2026 | Email | Lucila Cornejo | Hello Mike,
Hope you are well.
Please disregard the 24-hr composite sample requirement listed in the current permit. It should be a grab sample; this was a typo.
This was corrected and will be listed as a grab in the new draft permit that should be going out to you soon for review.
Thanks
Lucy Cornejo |
| 9/3/2024 | Email | Lucila Cornejo | Hi Lucy!!! I didn't put in the July 1st count is why it looked like I didn't have one for the next week. Sorry I will go and resubmit July's DMR. Thank you!! |
| 2/15/2024 | Email | Stephanie Giesin | From: Giesin, Stephanie (ECY)
Sent: Thursday, February 15, 2024 10:35 AM
To: jburbery@cityofchelan.us; jyoungren@cityofchelan.us
Cc: Van Doren, Erik (ECY) <erva461@ECY.WA.GOV>
Subject: Updated Interim Permit Contact
Importance: High
Good Morning,
I’m reaching out today to let you know there has been a change in our Technical Unit. We will be bringing on several new positions, so our unit has been split into two, the Municipal Unit and the Industrial Unit. I’ve been moved to the Industrial Unit, which means I am no longer managing municipal permits. Your new permit contact for the interim is Erik Van Doren, our Municipal Unit Supervisor. Please reach out to him with any questions or permit-related needs you may have.
Erik’s contact information:
Erik.vandoren@ecy.wa.gov
(509) 571-0934
It has been a pleasure working with you!
Stephanie Giesin
Permit Developer/Permit Manager
WA Dept. of Ecology | Water Quality
Central Regional Office
1250 W. Alder St. Union Gap, WA 98903
C: 509.504.0172
Stephanie.giesin@ecy.wa.gov |
| 1/26/2024 | Phone Call | David Matthews | Spoke with Eric Smith of RH2 on the phone:
- A park by Chelan Falls and a hatchery are looking to discharge to the POTW.
- The discharge of the hatchery would be less than SIU definitions of flows and loadings.
- I told Eric that the facility would likely not require a permit, but that plans review would be required as the extra force main isn't in the general sewer plan.
|
| 8/14/2023 | Phone Call | Stephanie Giesin | From: King, James (ECY) <jaki461@ECY.WA.GOV>
Sent: Monday, August 14, 2023 8:07 AM
To: Giesin, Stephanie (ECY) <sgie461@ECY.WA.GOV>
Subject: ERTS 724527 - Senor Frogs, Chelan
Good morning Stephanie,
I hope your Monday is off to a good start! I am just getting back from vacation and had this ERTS (724527) assigned while I was out. Mark thought it’s possible that the leak may be the result of a sanitary sewer overflow, and wanted me to check in with you before following up.
Do you know of any incidents around 8/3/23 involving the local WWTP?
Thanks a bunch and have a great day,
James King (he/him)
TMDL Project Lead
Water Quality Program, Department of Ecology / Central Region
1250 W. Alder St. Union Gap, WA 98903
Cell: (509) 379-5126
----------------------
I called Jim to follow up on an ERTS 724527 that occurred in the City of Chelan that the leak might have been a result of a sanitary sewer overflow that would have happened around 8/3/23. Jim said the only thing they had happen at the plant was an odor control problem that they were able to resolve. He said he is currently on vacation and will follow up with me next Tuesday to see if he can find anything out when he returns. |
| 12/16/2022 | Email | Stephanie Giesin | From: Eric Smith <esmith@rh2.com>
Sent: Friday, December 16, 2022 2:07 PM
To: Miller, Coleman (ECY) <comi461@ECY.WA.GOV>
Cc: Giesin, Stephanie (ECY) <sgie461@ECY.WA.GOV>; Travis Denham <tdenham@cityofchelan.us>; Daniel Dunagan <ddunagan@rh2.com>
Subject: City of Chelan WWTP Project
Hi Coleman,
As previously discussed, here is the current City of Chelan WWTP project preliminary design memorandum and associated cover letter for your records. Please let me know if you have any questions.
Thanks,
Eric Smith PE
Project Manager | RH2 Engineering, Inc.
300 Simon Street SE Suite #5
East Wenatchee, WA 98802
O: 509.886.6784
C: 509.679.8989
esmith@rh2.com
www.rh2.com |
| 8/25/2022 | Email | Stephanie Giesin | From: Giesin, Stephanie (ECY)
Sent: Thursday, August 25, 2022 1:53 PM
To: jyoungren@cityofchelan.us
Cc: jburbery@cityofchelan.us
Subject: WA0020605 Chelan POTW Permit Manager
Importance: High
Hello,
I wanted to reach out and introduce myself as your new permit manager for WA0020605 Chelan POTW along with the attached letter. My name is Stephanie Giesin. Please reach out to me with any questions related to your permit. Just a note, my phone number will be changing soon.
I look forward to working with you.
Thanks,
Stephanie Giesin
Permit Developer/Permit Manager
WA Dept. of Ecology | Water Quality
Central Regional Office
1250 W. Alder St. Union Gap, WA 98903
O: 509.454.7869 | C: 509.379.3878
Stephanie.giesin@ecy.wa.gov |
| 1/26/2022 | Email | Traci Pearson | Hi Jim,
Regarding Chelan POTW accepting septage disposal from Stehekin’s
system: I spoke with Erik Van Doren, our unit’s Supervisor yesterday
afternoon. He steered me to information that I believe is similar to what
we have discussed before when Chelan POTW was considering accepting isolated
instances of potential septage disposal.
Andy O’Neill would be a great resource, as well, for further
discussion about this topic. aone461@ecy.wa.gov
- or- (509) 710-3676
Links to information about septage disposal:
·
Attached to this email is EPA’s - Decentralized Systems
Technology Fact Sheet-Septage Treatment/Disposal
·
Link to Criteria for Sewage Works Design (The Orange Book) - https://apps.ecology.wa.gov/publications/documents/9837.pdf
Look at section T1-2.
·
Also consult your facility’s permit, special condition S6.
Pretreatment.
Regarding the administrative extension of Chelan POTW’s existing
NPDES permit WA0020506: We have drafted the letter which will grant the
extension. It will be signed by our section manager and then sent via either
email, or certified mail, to the attention of Jake Youngren, in the coming
week.
I hope all of this information is helpful.
Best,
Traci |
| 2/8/2021 | Email | Cindy Huwe | From: Microsoft Outlook <MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@wa.gov>
Sent: Monday, February 8, 2021 8:51 AM
To: Huwe, Cynthia (ECY)
Subject: Relayed: WA0020605-2021-02-08-AcceptApplication.pdf
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
jyoungren@cityofchelan.us (jyoungren@cityofchelan.us)
jburbery@cityofchelan.us (jburbery@cityofchelan.us)
Subject: WA0020605-2021-02-08-AcceptApplication.pdf
From: Huwe, Cynthia (ECY) <CHUW461@ECY.WA.GOV>
Sent: Monday, February 8, 2021 8:51 AM
To: jyoungren@cityofchelan.us; jburbery@cityofchelan.us
Cc: Gefre, Traci (ECY) <tjef461@ECY.WA.GOV>
Subject: WA0020605-2021-02-08-AcceptApplication.pdf
Attached is the City of Chelan POTW renewal application acceptance letter.
WA State Department of Ecology Central Regional Offices is closed to walk-in service until further notice as we adhere to a statewide effort to slow the spread of the coronavirus (COVID-19). Regional staff are available by telephone and email, and information is also available on our website. We remain committed to service, so don’t hesitate to reach out to us.
Cynthia Huwe
|
| 12/1/2020 | Email | Cindy Huwe | From: Microsoft Outlook <MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@wa.gov>
Sent: Tuesday, December 1, 2020 2:45 PM
To: Huwe, Cynthia (ECY)
Subject: Relayed: WA0020605-2020-12-01-RequestRenewApplication.pdf
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
jyoungren@cityofchelan.us (jyoungren@cityofchelan.us)
jburbery@cityofchelan.us (jburbery@cityofchelan.us)
Subject: WA0020605-2020-12-01-RequestRenewApplication.pdf
From: Huwe, Cynthia (ECY) <CHUW461@ECY.WA.GOV>
Sent: Tuesday, December 1, 2020 2:45 PM
To: jyoungren@cityofchelan.us; jburbery@cityofchelan.us
Subject: WA0020605-2020-12-01-RequestRenewApplication.pdf
Importance: High
Jake and Jim,
Permit No. WA0020605 for the City of Chelan Publicly-Owned Treatment Works is due to expire on January 31, 2022. Federal law and regulation require an application for renewal of this permit. You must send the renewal application to our office on or before January 31, 2021. Form 2A instructions to follow in a second email.
WA State Department of Ecology Central Regional Offices is closed to walk-in service until further notice as we adhere to a statewide effort to slow the spread of the coronavirus (COVID-19). Regional staff are available by telephone and email, and information is also available on our website. We remain committed to service, so don’t hesitate to reach out to us.
Cynthia Huwe
Water Quality Permit Coordinator
|
| 12/1/2020 | Email | Cindy Huwe | From: Microsoft Outlook <MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@wa.gov>
Sent: Tuesday, December 1, 2020 2:47 PM
To: Huwe, Cynthia (ECY)
Subject: Relayed: Form 2A instructions
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
jyoungren@cityofchelan.us (jyoungren@cityofchelan.us)
jburbery@cityofchelan.us (jburbery@cityofchelan.us)
Subject: Form 2A instructions
From: Huwe, Cynthia (ECY) <CHUW461@ECY.WA.GOV>
Sent: Tuesday, December 1, 2020 2:46 PM
To: jyoungren@cityofchelan.us; jburbery@cityofchelan.us
Subject: Form 2A instructions
Jake and Jim,
Attached are the instructions for completing NPDES Form 2A
WA State Department of Ecology Central Regional Offices is closed to walk-in service until further notice as we adhere to a statewide effort to slow the spread of the coronavirus (COVID-19). Regional staff are available by telephone and email, and information is also available on our website. We remain committed to service, so don’t hesitate to reach out to us.
Cynthia Huwe
Water Quality Permit Coordinator
|
| 12/1/2020 | Email | Cindy Huwe | From: Jim Burbery <jburbery@cityofchelan.us>
Sent: Tuesday, December 1, 2020 2:57 PM
To: Huwe, Cynthia (ECY) <CHUW461@ECY.WA.GOV>
Subject: Re: Form 2A instructions
THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the link
Hi Cynthia
I have got started on the Form 2A. Trying to gather a little info.
Thank you for the reminder.
Jim Burbery
City of Chelan
WWTP Operator
509-670-1439
NOTICE: This e-mail account is part of the public domain. Any correspondence and attachments, including personal information, sent to and from the City of Chelan are subject to the Washington State Public Records Act, Chapter 42.56 RCW and may be subject to disclosure to a third party requestor, regardless of any claim of confidentiality or privilege asserted by an external party.
|
| 11/30/2020 | Phone Call | Traci Pearson | 11/30/2020: Call from Jim B. Contracted group for outfall evaluation reported technical difficulties to Chelan POTW and rescheduled outfall eval for next week. |
| 8/11/2020 | Email | Cindy Huwe | From: Microsoft Outlook <MicrosoftExchange329e71ec88ae4615bbc36ab6ce41109e@wa.gov>
Sent: Tuesday, August 11, 2020 8:55 AM
To: Huwe, Cynthia (ECY)
Subject: Relayed: Chelan POTW, WA0020605 Upcoming Permit Submittal
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server:
jyoungren@cityofchelan.us (jyoungren@cityofchelan.us)
jburbery@cityofchelan.us (jburbery@cityofchelan.us)
Subject: Chelan POTW, WA0020605 Upcoming Permit Submittal
From: Huwe, Cynthia (ECY) <CHUW461@ECY.WA.GOV>
Sent: Tuesday, August 11, 2020 8:55 AM
To: jyoungren@cityofchelan.us; jburbery@cityofchelan.us
Cc: Gefre, Traci (ECY) <tjef461@ECY.WA.GOV>
Subject: Chelan POTW, WA0020605 Upcoming Permit Submittal
Importance: High
Reminder of upcoming permit submittals for Chelan POTW, Permit No. WA0020605.
During this unprecedented time, please don’t hesitate to reach out to your permit manager for assistance if you are unable to meet the submittal deadline.
If you use the WQWebPortal, you do not need to submit a hard copy of the report to Ecology.
If you have any questions, please contact your permit manager, Traci Gefre at traci.gefre@ecy.wa.gov .
Our records show that the following required reports or submittals will be due by the date listed below:
|
Permit Section
|
Submittal/Report
|
Submittal Due Date
|
|
S9.
|
Outfall Evaluation (page 28)
|
December 15, 2020
|
In most cases, the reports or submittals can be uploaded into the WQWebPortal (under Submit data for: click on Permit Submittals). If you use the WQWebPortal to upload your report/submittal, you do not need to mail in a hard copy of the report to Ecology.
Please do not attach the reports to your monthly Discharge Monitoring Reports (DMRs).
Reports or submittals that are not received by Ecology by their required date are violations of your permit. Please be aware that violations are subject to enforcement action in accordance with Chapter 173-220-230 of the Washington Administrative Code (WAC).
If you have received this e-mail in error or you do not wish to receive these types of e-mails, please let me know.
Thank you. |
|