Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington

 
Publication number Date Published
03-03-103April 2003
VIEW NOW Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington (Number of pages: 31) (Publication Size: 751KB)




Trouble viewing? Try these free options.
Author(s) Serdar, D. and B. Era-Miller
Description This is a quality assurance project plan for the Total Maximum Daily Load Study: DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords Mission, transport, county, creek, study, basin, plan, quality assurance, quality assurance project plan, quality, Total Maximum Daily Load, contamination, DDT
WATERSHED Water Resource Inventory Area 45 Wenatchee
DATA Environmental Information Management (EIM) #DSER0011

RELATED PUBLICATIONS Title:

DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County: Total Maximum Daily Load Assessment