Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Wilson Creek Sub-Basin Bacteria Total Maximum Daily Load (Water Cleanup Plan): Submittal Report

 
Publication number Date Published Date Revised
05-10-041March 2005June 2005
VIEW NOW Wilson Creek Sub-Basin Bacteria Total Maximum Daily Load (Water Cleanup Plan): Submittal Report (Number of pages: 132) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Creech, Jane and Gregory Bohn
Description The Washington State Department of Ecology (Ecology) is establishing a total maximum daily load (TMDL) for the Wilson Creek sub-basin, which covers the pollution parameter of fecal coliform bacteria. This TMDL will address potential impairments of beneficial uses of Wilson Creek and its tributaries, some of which include water bodies listed in the 1998 Section 303(d) list of Washington State impaired surface waters.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Jane Creech at 360-407-6600 or jane.creech@ecy.wa.gov
Keywords 303(d), section 303, cleanup, water cleanup plan, Total Maximum Daily Load, bacteria
RELATED PUBLICATIONS Title:

Wilson Creek Sub-basin Bacteria Total Maximum Daily Load: First Water Quality Post TMDL Monitoring Report

Wilson Creek Sub-Basin Fecal Coliform Bacteria Effectiveness Monitoring Water Quality Study Design (Quality Assurance Project Plan)

Wilson Creek Sub-basin Bacteria Total Maximum Daily Load Detailed Implementation Plan