Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study

 
Publication number Date Published
06-03-201January 2006
VIEW NOW Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study (Number of pages: 19) (Publication Size: 491KB)




Trouble viewing? Try these free options.
Author(s) Bell-McKinnon, M.
Description This is the quality assurance project plan for the Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords 303(d), section 303, water, quality assurance project plan, monitoring, quality, Total Maximum Daily Load, lake, Environmental Protection Agency
WATERSHED Water Resource Inventory Area 08 Cedar-Sammamish
DATA Environmental Information Management (EIM) #MBEL0002

RELATED PUBLICATIONS Title:

Lake Ballinger Total Phosphorus Total Maximum Daily Load: Water Quality Attainment Monitoring Report

Ballinger Lake Total Phosphorus Total Maximum Daily Load