Title | Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study (Number of pages: 19) (Publication Size: 491KB)
|
||||
Author(s) | Bell-McKinnon, M. | ||||
Description | This is the quality assurance project plan for the Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | 303(d), section 303, water, quality assurance project plan, monitoring, quality, Total Maximum Daily Load, lake, Environmental Protection Agency | ||||
WATERSHED | Water Resource Inventory Area 08 Cedar-Sammamish | ||||
DATA | Environmental Information Management (EIM) #MBEL0002 |
||||
RELATED PUBLICATIONS | Title:
Lake Ballinger Total Phosphorus Total Maximum Daily Load: Water Quality Attainment Monitoring Report Ballinger Lake Total Phosphorus Total Maximum Daily Load |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.