Title | Periodic Dam Safety Inspection Report: McMillin Reservoir No. 1 & 2--Pierce County, Washington (Historical) |
||||
|
|||||
VIEW NOW | This publication is historical. It is unavailable on our website. To request a copy, please use the contact listed below. | ||||
Author(s) | David Cummings and Jerald LaVassar | ||||
Description | Under state law (RCW 43.21A.064(2)), the Department of Ecology has responsibility and authority to inspect the construction of all dams and other works related to the use of water, and to require necessary changes in construction or maintenance to reasonably secure safety to life and property. This report has been prepared in accordance with this statute. The report presents the results of the first periodic inspection and safety evaluation of the McMillin Reservoir No. 1 & 2 by the Ecology Dam Safety Office (DSO). The report provides: Background information, a description of the project, results of the December 2, 2004 inspection, engineering evaluation and analyses of the design of the project, and required remedial actions based on the findings from the current inspection |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Water Resources Program at 360-407-6872 | ||||
Keywords | dam inspection, dam safety | ||||
WEB PAGE | Dam Safety Office |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.