Title | Everett Smelter Site –2007 Soil Cleanup BI-WEEKLY NEWSLETTER #13 |
||||
|
|||||
VIEW NOW |
Everett Smelter Site –2007 Soil Cleanup BI-WEEKLY NEWSLETTER #13 (Number of pages: 2) (Publication Size: 102KB)
Note: For additional information, see related web content below.
|
||||
Author(s) | Nancy Lui | ||||
Description | Ecology’s contractor, Wyser Construction, Inc. began cleanup work at the 10 homes located on the east side of Bridgeway in Everett, WA on May 21, 2007. The cleanup will remove and dispose of accessible soil contaminated with arsenic and lead. Soil is accessible if it is not under the house, paved driveways and walkways, or patios. All accessible contaminated soil with arsenic levels above 20 mg/Kg that is within one foot of the surface will be removed and replaced with clean topsoil. | ||||
REQUEST A COPY |
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information |
||||
Contact | Jerome Cruz at 425-649-7094 | ||||
Keywords | soil, smelter, clean up | ||||
WEB PAGE | Additional information |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.