Title

Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills

 
Publication number Date Published
09-03-004January 2009
VIEW NOW Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills (Number of pages: 55) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Lubliner, B.
Description In 2007-2008, the Department of Ecology monitored polychlorinated biphenyls (PCBs) and dieldrin at three wastewater treatment plants (WWTPs) and two abandoned landfills in the South Fork Palouse River watershed.

This study was to (1) establish whether the WWTP discharges exceed EPA human health criteria, and (2) assess landfills as sources of PCBs and dieldrin.

The findings indicate PCB reductions at all three WWTPs, and dieldrin reductions at the Pullman WWTP, are necessary. The soils/sediment and surface water samples from the two landfills contained the contaminants at relatively low levels.

Continued monitoring and limited pollution source tracking measures are recommended.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords dieldrin, wastewater treatment plant, soil, toxics monitoring, load reductions, river, water, sediment, toxic, watershed, Total Maximum Daily Load, PCBs, landfill, Environmental Protection Agency
WATERSHED Water Resource Inventory Area 34 Palouse
DATA Environmental Information Management (EIM) #BRWA0003

RELATED PUBLICATIONS Title:

Quality Assurance Project Plan: Dieldrin and PCB Monitoring of Wastewater Treatment Plants in the Palouse River Watershed

Palouse River Chlorinated Pesticide and PCB Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan