Title | Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway. |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway. (Number of pages: 36) (Publication Size: 1MB)
|
||||
Author(s) | Gries, T. and J. Sloan | ||||
Description | This is the study plan for tracking short-term movements of suspended sediments in the Lower Duwamish Waterway. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Lower Duwamish Waterway, tracking, suspended sediment, model, Green River, waterway, river, water, quality assurance project plan, Ecology | ||||
WEB PAGE | Lower Duwamish Waterway | ||||
WATERSHED | Water Resource Inventory Area 09 Duwamish-Green | ||||
RELATED PUBLICATIONS | Title:
POSTER: Sediment transport and contaminant loading to the Lower Duwamish Superfund Site from the Green River: Application of innovative sampling technologies to verify model predictions Lower Duwamish Waterway: Tracing Short-Term Movements of Suspended Sediment, Summary Report POSTER: Use of Fluorescent Tracer Particles in the Lower Duwamish Waterway |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.