Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study

 
Publication number Date Published
10-03-111September 2010
VIEW NOW Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study (Number of pages: 25) (Publication Size: 986KB)




Trouble viewing? Try these free options.
Author(s) Carroll, J.
Description This is the quality assurance project plan for the study, Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords creek, model, basin, river, water, quality assurance project plan, assessment, Total Maximum Daily Load, section 303(d), pH, dissolved oxygen, Environmental Protection Agency, clean water act
WATERSHED Water Resource Inventory Area 34 Palouse
DATA Environmental Information Management (EIM) #JICA0000

RELATED PUBLICATIONS Title:

Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study