Title | Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study (Number of pages: 25) (Publication Size: 986KB)
|
||||
Author(s) | Carroll, J. | ||||
Description | This is the quality assurance project plan for the study, Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | creek, model, basin, river, water, quality assurance project plan, assessment, Total Maximum Daily Load, section 303(d), pH, dissolved oxygen, Environmental Protection Agency, clean water act | ||||
WATERSHED | Water Resource Inventory Area 34 Palouse | ||||
DATA | Environmental Information Management (EIM) #JICA0000 |
||||
RELATED PUBLICATIONS | Title:
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.