Title | Pend Oreille Mine Site |
||||
|
|||||
VIEW NOW |
Pend Oreille Mine Site (Number of pages: 5) (Publication Size: 147KB)
Note: For more information see related web content below. You may print the publication by clicking on the PDF link above.
|
||||
Author(s) | Carol Bergin | ||||
Description | Results of Investigation and Proposed Cleanup Alternatives Available for Comment. Teck Cominco American Inc. entered into a legal agreement with the Washington State Department of Ecology in 2005. The agreement required Teck to conduct a Remedial Investigation and Reasibility Study (RI/FS). The site is located two miles north of Metaline Falls on the east side of the Pend Oreille River in Pend Oreille County. The public is invited to review the draft FI/FS and Supplemental RI/FS Report. Comments will be accepted June 21 through July 22, 2010. Related Web Content: https://fortress.wa.gov/ecy/gsp/Sitepage.aspx?csid=2194 |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | William Fees at 509-329-3589 | ||||
Keywords | public comment period, Remedial Investigation, feasibility study, cleanup, mining | ||||
FACILITY SITE | Facility Site ID: 15428546 |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.