Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report

 
Publication number Date Published Date Revised
10-10-065March 2011November 2011
VIEW NOW Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report (Number of pages: 408) (Publication Size: 12MB)




Trouble viewing? Try these free options.
Author(s) Baldwin, Karin; Whiley, Anthony; Pickett, Paul; Moore, David
Description This total maximum daily load (TMDL) report addresses water temperatures within the Pend Oreille River in response to observations of chronically elevated temperatures at levels exceeding the river’s specific criteria. Elevated temperatures result in impacts to salmonid spawning, rearing, and migration, which is the designated use established for the river and protected by the water quality standards.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Karin Baldwin at 509-329-3601 or karin.baldwin@ecy.wa.gov
Keywords water quality improvement, temperature, Columbia River, river, water quality, TMDL, Total Maximum Daily Load
DATA Environmental Information Management (EIM) #PPIC0006

RELATED PUBLICATIONS Title:

Errata: Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report

Addendum to Quality Assurance Project Plan: Pend Oreille River Temperature TMDL

Quality Assurance Project Plan: Pend Oreille River Temperature Total Maximum Daily Load Technical Study