Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report and Implementation Plan

 
Publication number Date Published Date Revised
10-10-067October 2010December 2010
VIEW NOW Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report and Implementation Plan (Number of pages: 141) (Publication Size: 2MB)




Trouble viewing? Try these free options.
Author(s) Tarbutton, Carroll, Snouwaert
Description The Palouse River and three of its tributaries (Rebel Flat Creek, Willow Creek, and Cow Creek) are listed on the federal Clean Water Act 303(d) list as impaired for fecal coliform bacteria. This Total Maximum Daily Load (TMDL) report includes a study of the bacteria impairment, indicates how much the bacteria needs to be reduced to meet Washington State water quality standards (load and wasteload allocations), and describes activities to achieve those reductions.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Elaine Snouwaert at 509-329-3503 or Elaine.Snouwaert@ecy.wa.gov
Keywords Palouse River, water quality improvement plan, 303(d), Total Maximum Daily Load, fecal coliform, clean water act
WEB PAGE Palouse River
DATA Environmental Information Management (EIM) #JICA0001

RELATED PUBLICATIONS Title:

North Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan

Quality Assurance Project Plan: North Fork Palouse River Fecal Coliform Bacteria Data Evaluation

Streamflow Summary for the Palouse and South Fork Palouse Rivers and Selected Tributaries, 2006-08

Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design