Title | Control of Toxic Chemicals in Puget Sound: Evaluation of Loading of Toxic Chemicals to Puget Sound by Direct Groundwater Discharge |
||||
|
|||||
VIEW NOW |
Control of Toxic Chemicals in Puget Sound: Evaluation of Loading of Toxic Chemicals to Puget Sound by Direct Groundwater Discharge (Number of pages: 47) (Publication Size: 1MB)
|
||||
Author(s) | Pitz, C. | ||||
Description | This study presents estimates of the annual chemical mass delivered to Puget Sound by direct (submarine) groundwater discharge, for 34 toxic chemicals of concern. The report (1) describes the methods and assumptions used to develop the loading estimates and (2) discusses sources of uncertainty in the values. The loading estimates best represent an upper-bound (worst-case) condition; actual toxic loading to Puget Sound by direct groundwater discharge is likely significantly lower than the estimates presented. The groundwater loading estimates will be synthesized with loading estimates for other toxic delivery pathways during Phase 3 of the Control of Toxic Chemicals in Puget Sound project. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | toxic chemicals, model, basin, loading, Puget Sound, groundwater, discharge | ||||
WEB PAGE | Toxic chemicals in Puget Sound | ||||
WATERSHED | Water Resource Inventory Area PS Puget Sound | ||||
RELATED PUBLICATIONS | Title:
Appendix A: Shoreline Classification Analysis Results Appendix B: Groundwater Discharge Analysis Results Appendix C: COC Concentration and Mass Flux Estimates - Non-detect substitution Method 1 (0.5RL) Appendix D: COC Concentration and Mass Flux Estimates - Non-detect substitution Method 2 (Lowest RL) Appendix E: COC Concentration Decision - Ambient Areas Quality Assurance Project Plan: Puget Sound Groundwater Toxics Loading Analysis, Direct Discharge Pathway |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.