Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Lake Chelan Wapato Basin Total Phosphorus Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report

 
Publication number Date Published
11-03-049November 2011
VIEW NOW Lake Chelan Wapato Basin Total Phosphorus Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report (Number of pages: 68) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Newell, E. and C. Coffin
Description Water samples were collected and analyzed from Lake Chelan in 2007 to monitor a preventive Total Maximum Daily Load (TMDL) for total phosphorus. The TMDL criterion was met (not exceeded) for this monitoring. Weak decreasing trends were found in total phosphorus concentrations from 1987 to 2007. Good water quality was indicated by low chlorophyll-a concentrations and high water transparency. Phosphorus was the limiting nutrient in the lake based on nitrogen-to-phosphorus ratios and the trophic state index (TSI).
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords Lake Chelan, basin, water quality, monitoring, Total Maximum Daily Load, phosphorus
WATERSHED Water Resource Inventory Area 47 Chelan
DATA Environmental Information Management (EIM) #CCOF0004

RELATED PUBLICATIONS Title:

Quality Assurance Project Plan: Lake Chelan Wapato Basin Total Phosphorus TMDL Effectiveness Monitoring, 2007