Title | Second Periodic Dam Safety Inspection Report - Zosel Dam (Historical) |
||||
|
|||||
VIEW NOW | This publication is historical. It is unavailable on our website. To request a copy, please use the contact listed below. | ||||
Author(s) | Dave Cummings, Doug Johnson | ||||
Description | The report presents the results of the second periodic inspection and safety evaluation of the Zosel Dam by the Ecology Dam Safety Office (DSO). The report provides: Background information. A description of the project. Findings of the October 8, 2009 inspection. Engineering evaluation and analyses of the design of the project. Required remedial actions based on the findings from the current inspection. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Water Resources Program at 360-407-6872 | ||||
Keywords | zosel Dam, Inspection report, dam safety | ||||
WATERSHED | Water Resource Inventory Area 49 Okanogan |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.