Title | Cle Elum Pool Raise At A Glance - Yakima River Basin Integrated Water Resource Management Plan (Historical) |
||||
|
|||||
VIEW NOW | This publication is historical. It is unavailable on our website. To request a copy, please use the contact listed below. | ||||
Author(s) | Hill, Tim | ||||
Description | Under the Integrated Plan, the level of Cle Elum Lake will be raised by 3 feet (from 2,240 feet to 2,243 feet above mean sea level). Raising the pool will increase the reservoir’s available storage volume by approximately 14,600 acre-feet, benefitting irrigation, stream flows for fish, and domestic, municipal, and industrial users. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Tim Hill at 509-454-4242 or tim.hill@ecy.wa.gov | ||||
Keywords | Yakima Basin Integrated Water Management Plan, Yakima River Basin, Cle Elum, OCR, Yakima, water management, Reservoir, water storage, water availability, Columbia Basin, Yakima Basin, Yakima River, Columbia River, water supply, water, water resource, water banking, Pool raise | ||||
WEB PAGE | Yakima River Basin Water Projects | ||||
RELATED PUBLICATIONS | Title:
Yakima River Basin Integrated Water Resource Management Plan Final Programmatic Environmental Impact Statement |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.