Title | Addendum to the Colville National Forest Temperature and Bacteria Total Maximum Daily Load: Water Quality Implementation Plan |
||||
|
|||||
VIEW NOW |
Addendum to the Colville National Forest Temperature and Bacteria Total Maximum Daily Load: Water Quality Implementation Plan (Number of pages: 3) (Publication Size: 126KB)
|
||||
Author(s) | Parodi, Jean | ||||
Description | This addendum extends the final target date of October 2013 for bacteria concentrations to meet water quality standards to October 2018. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Jean Parodi at 509-329-3517 or jean.parodi@ecy.wa.gov | ||||
Keywords | water quality improvement project, water cleanup plan, water quality, TMDL, Total Maximum Daily Load, fecal coliform, bacteria | ||||
WEB PAGE | Colville National Forest Area: Multi-parameter | ||||
RELATED PUBLICATIONS | Title:
Colville National Forest Temperature and Bacteria TMDL: Second addendum to the Colville National Forest Temperature and Bacteria TMDL Water Quality Implementation Plan Colville National Forest Temperature and Bacteria Total Maximum Daily Load: Water Quality Implementation Plan Colville National Forest Temperature, Bacteria, and pH Total Maximum Daily Load (Water Cleanup Plan): Submittal Report |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.