Title | Addendum 2 to Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Design |
||||
|
|||||
VIEW NOW |
Addendum 2 to Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Design (Number of pages: 80) (Publication Size: 1917KB)
|
||||
Author(s) | Stuart, T. and P. Pickett | ||||
Description | This is an addendum to the project plan for the study, Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Tighe Stuart at 509-329-3476 or tist461@ecy.wa.gov | ||||
Keywords | HUC: 17010308, water quality improvement, Spokane River, 303(d), river, watershed, Total Maximum Daily Load, pH, dissolved oxygen | ||||
WATERSHED | Water Resource Inventory Area 55 Little Spokane | ||||
DATA | Environmental Information Management (EIM) #jjoy0007 |
||||
RELATED PUBLICATIONS | Title:
Addendum to Quality Assurance Project Plan Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.