Title | Quality Assurance Project Plan: Upper Yakima River Basin Suspended Sediment and Turbidity Status Monitoring |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Upper Yakima River Basin Suspended Sediment and Turbidity Status Monitoring (Number of pages: 64) (Publication Size: 1189KB)
|
||||
Author(s) | Carroll, J. and E. Urmos-Berry | ||||
Description | This monitoring project will assess the status of total suspended sediment and turbidity levels as called for in the final TMDL schedule. Samples will be collected every two weeks from 28 locations in the Upper Yakima basin. Sampling will occur from the end of February through November 2019, capturing the critical period during the whole irrigation season, as well as some pre- and post-irrigation periods. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 360-407-6764 or EAPPubs@ecy.wa.gov | ||||
Keywords | turbidity, Yakima River Basin, sediment sampling, Yakima, suspended sediment, sediment monitoring, Yakima Basin, Yakima River, sediment | ||||
WATERSHED | Water Resource Inventory Area 39 Upper Yakima | ||||
DATA | Environmental Information Management (EIM) #jica0004 |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.