Title | Quality Assurance Project Plan - Puyallup River Tributaries Effectiveness Monitoring |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan - Puyallup River Tributaries Effectiveness Monitoring (Number of pages: 64) (Publication Size: 2986KB)
|
||||
Author(s) | Water Quality Program | ||||
Description | Quality Assurance Project Plan for Puyallup River Tributaries Effectiveness Monitoring study. | ||||
NOTES | QAPP - EAP & WQ monitoring | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Allison Brownlee at 360-407-6600 or allison.brownlee@ecy.wa.gov | ||||
Keywords | Puyallup River, QAPP, Nonpoint Pollution, Boise River, Second Creek, Pussyfoot Creek, TMDL Effectiveness, rivers, Quality Assurance Plan, nonpoint, surface water, quality assurance, water quality, monitoring, streams, TMDL, non point | ||||
RELATED PUBLICATIONS | Title:
Pussyfoot Creek and Second Creek Fecal Coliform Characterization Monitoring: Two Tributaries to the White River Quality Assurance Project Plan: Pussyfoot Creek and Second Creek Fecal Coliform Bacteria Characterization Monitoring Lower White River pH Total Maximum Daily Load Water Quality Study Design (Quality Assurance Project Plan) Puyallup River Watershed: Fecal Coliform Total Maximum Daily Load - Water Quality Improvement Report and Implementation Plan |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.