Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Puyallup Wastewater Treatment Plant Class II Inspection--January 19-20, 1988.

 
Publication number Date Published
88-e11May 1988
VIEW NOW Puyallup Wastewater Treatment Plant Class II Inspection--January 19-20, 1988. (Number of pages: 37) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Hallinan, P.
Description A Class II inspection was conducted at the Puyallup Wastewater Treatment Plant (WTP) on January 19 and 20, 1988. The WTP is a rotating biological contractor facility serving the city of Puyallup. High total suspended solids (TSS) and BOD5 removals were achieved by the plant during the inspection. The WTP laboratory has had difficulties meeting EPA quality assurance tests in the past. Lab procedures as reviewed by Ecology indicated protocols at the WTP lab have been improved. Bioassay test results indicated the effluent was not toxic.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords wastewater treatment plant, bioassay, Inspection, wastewater, treatment, toxic, waste
WATERSHED Water Resource Inventory Area 10 Puyallup-White