Title | South Fork Palouse River Basin Class II Inspections at Pullman and Albion, July 23-25 and October 1-3, 1991 |
||||
|
|||||
VIEW NOW |
South Fork Palouse River Basin Class II Inspections at Pullman and Albion, July 23-25 and October 1-3, 1991 (Number of pages: 23) (Publication Size: 1MB)
|
||||
Author(s) | Glenn, N. | ||||
Description | The Pullman wastewater treatment plant was operating at a high efficiency and being well maintained at the time of the Class II Inspection on July 23-25; and again during a resampling on October 1-3, 1991. Nearly full nitrification was occurring on both occasions. However, past treatment plant records indicate that full nitrification is not predictable. Hydraulic and waste loads to the plant are approaching design criteria. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | wastewater treatment plant, inspections, river, pH, laboratory | ||||
WATERSHED | Water Resource Inventory Area 34 Palouse |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.