Title | Puyallup Basin Treatment Plant Metals Survey |
||||
|
|||||
VIEW NOW |
Puyallup Basin Treatment Plant Metals Survey (Number of pages: 49) (Publication Size: 3MB)
|
||||
Author(s) | Hoyle-Dodson, G. | ||||
Description | A one-year survey of effluent metal concentrations and associated general chemistry parameters was conducted on four wastewater treatment plants (WWTPs) and their receiving waters, all located within the Puyallup River drainage basin. The facilities include: the Orting WWTP on the lower Carbonado River, the Buckley WWTP on the White River, the Wilkeson WWTP on Wilkeson Creek, and the Carbonado WWTP on the upper Carbonado. Samples were take bimonthly at the Orting and Buckley facilities, and once every four months at the Wilkeson and Carbonado facilities. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | White River, total suspended solids, receiving water, wastewater treatment plant, samples, creek, metals, change, flow, treatment, basin, river, water, water quality, survey, waste, zinc, mercury, NPDES, flood, effluent, copper | ||||
WATERSHED | Water Resource Inventory Area 10 Puyallup-White |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.