Title | Quality Assurance Project Plan: Upper Yakima River Suspended Sediment Total Maximum Daily Load |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Upper Yakima River Suspended Sediment Total Maximum Daily Load (Number of pages: 23) (Publication Size: 676KB)
|
||||
Author(s) | Dickes, B., J. Joy | ||||
Description | This is the study plan for Upper Yakima River Suspended Sediment Total Maximum Daily Load. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | J. Joy at 360-407-6486 or jjoy461@ecy.wa.gov | ||||
Keywords | quality assurance project plan, TMDL, Total Maximum Daily Load, fecal coliform, DDT | ||||
WATERSHED | Water Resource Inventory Area 39 Upper Yakima | ||||
DATA | Environmental Information Management (EIM) #BEDI0006 |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.