Title | Peabody Heights Reservoir Periodic Inspection Report (Historical) |
||||
|
|||||
VIEW NOW | This publication is historical. It is unavailable on our website. To request a copy, please use the contact listed below. | ||||
Author(s) | Douglas L. Johnson, Gustavo A. Ordonez, W. David Cummings | ||||
Description | The report presents the results of the two field inspections and the subsequent safety evaluation of the Peabody Heights Reservoir. The report provides: *Background Information, *A description of the project, *Results of the March 12 and May 7, 1996 inspections, *Engineering evaluation and analyses of the design of the project *Required remedial actions based on the findings. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Water Resources Program at 360-407-6872 | ||||
Keywords | safety, analyses, water, water resource, construction, dam, dam construction, dam inspection, dam safety | ||||
WEB PAGE | Water Resources Program |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.