Title | Chaplain Lake North & South Dams Second Periodic Inspection Report (Historical) |
||||
|
|||||
VIEW NOW | This publication is historical. It is unavailable on our website. To request a copy, please use the contact listed below. | ||||
Author(s) | Douglas L. Johnson, Jerald M. LaVassar | ||||
Description | The report presents the results of the second periodic inspection and safety evaluation of the Chaplain Lake South and North Dams. The report provides: *Background information, *A description of the project, *Results of the April 13, 1995 inspection, *Engineering evaluation and the analyses of the design of the project, *A listing of deficiencies from the last inspection, and their current status, *Required remedial actions based on the findings from the current inspection. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Water Resources Program at 360-407-6872 | ||||
Keywords | progress report, safety, water, water resource, construction, dam, dam construction, dam inspection, dam safety | ||||
WEB PAGE | Water Resources Program |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.