Publications Home



Quality Assurance Project Plans (QAPPs) (578 publications 1994-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1995 · 1994 ·

Title (link to summary)NumberDate (released or updated)
Quality Assurance Project Plan: Fourth Screening Investigation of Water and Sediment Quality in Creeks from Selected Washington Mining Districts 05-10-088December 2005
Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section 05-03-205December 2005
Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit 05-03-202December 2005
Quality Assurance Project Plan (Revised): Little Spokane River Watershed Total Maximum Daily Load Study 05-03-121December 2005
Quality Assurance Project Plan: Assessment of Ambient Groundwater Quality Conditions in the Surficial Unconsolidated Sedimentary Aquifer of the Moxee Valley, Yakima County, Washington 05-03-119December 2005
Quality Assurance Project Plan: Toxics in Stormwater Runoff from Puget Sound Boatyards 05-03-118December 2005
Quality Assurance Project Plan: Squalicum Harbor Tributyltin (TBT) Investigation 05-03-117November 2005
Quality Assurance Project Plan: South Puget Sound Fish and Shellfish Tissue Verification of 303(d) Listings 05-03-116November 2005
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study 05-03-115November 2005
Quality Assurance Project Plan: Hood Canal Dissolved Oxygen Program Integrated Assessment and Modeling Study Year 1 Activities 05-03-114November 2005
Quality Assurance Project Plan: PBT Monitoring: Measuring PBDE Levels in Washington Rivers and Lakes 05-03-113September 2005
Quality Assurance Project Plan: Metals Concentrations from Stormwater Runoff in an Industrial Area Creek 05-03-112September 2005
Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study 05-03-203August 2005
Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study 05-03-111June 2005
Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study 05-03-110June 2005
Quality Assurance Project Plan: Cornet Bay Intertidal Contaminant Screening Survey 05-03-109June 2005
Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek 05-03-107May 2005
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish 05-03-106May 2005
Quality Assurance Project Plan: Bioaccumulative Chemicals in Hatchery Feed and Hatchery Fish 05-03-104May 2005
Quality Assurance Project Plan: Investigation of Petroleum Products in Black Lake Sediment and Surface Water from Underground Tanks. 05-03-105April 2005
Quality Assurance Project Plan: A Survey of Zinc Concentrations in Industrial Stormwater Runoff 05-03-103April 2005
Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring 05-03-201February 2005
Quality Assurance Project Plan: Saginaw Mill Groundwater Monitoring 05-03-102February 2005
Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study 05-03-101January 2005