Title (link to summary) | Number | Date (released or updated) |
Black Sand Beach
| 10-09-021 | December 2009 |
Quality Assurance Project Plan: Assessment of Aquatic Toxicity in North Creek, Gig Harbor.
| 09-03-132 | November 2009 |
Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River
| 09-03-028 | November 2009 |
Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway.
| 09-03-124 | October 2009 |
Lower Duwamish Waterway Source Control Status Report September 2008 through June 2009
| 09-09-183 | September 2009 |
Lower Duwamish Waterway: Tracing Short-Term Movements of Suspended Sediment, Summary Report
| 09-03-048 | September 2009 |
Mercury Sources to Lake Ozette and Lake Dickey: Highly Contaminated Remote Coastal Lakes, Washington State, USA. Article in the journal, Water, Air, & Soil Pollution, Vol 208, No 1-4, p 275-286.
| 09-03-047 | September 2009 |
Focus on Puget Sound's Urban Bays: Sediment Quality in Elliott Bay, 1998 to 2007
| 09-03-043 | September 2009 |
Urban Waters Initiative, 2007: Sediment Quality Changes in Elliott Bay since 1998 (Summary)
| 09-03-031 | September 2009 |
Urban Waters Initiative, 2007: Sediment Quality in Elliott Bay
| 09-03-014 | September 2009 |
Spokane River Metals Flora Road Site - Comments Sought on Construction, SEPA, and Substantive Requirements Documents
| 09-09-028 | August 2009 |
Quality Assurance Project Plan: The Puget Sound Assessment and Monitoring Program Sediment Monitoring Component.
| 09-03-121 | August 2009 |
Sediment Characterization Study in Port Gardner and Lower Snohomish Estuary, Port Gardner, WA: Final Data Report
| 09-09-227 | July 2009 |
Lower Duwamish Waterway RM 1.2-1.7 East (Saint Gobain to Glacier Northwest) Source Control Action Plan Final Report
| 09-09-087 | July 2009 |
Lower Duwamish Waterway River Mile 0.0-0.1 East (Spokane Street to Ash Grove Cement) - Source Control Action Plan
| 09-09-086 | July 2009 |
Lower Duwamish Waterway RM 1.7 to 2.0 East (Slip 2 to Slip 3) - Source Control Action Plan
| 09-09-085 | July 2009 |
Lower Duwamish Waterway RM 2.3-2.8 East (Seattle Boiler Works to Slip 4) - Source Control Action Plan
| 09-09-083 | July 2009 |
Control of Toxic Chemicals in Puget Sound - Phase 2: Sediment Flux/Puget Sound Sediments, Bioaccumulation Model - Derived Concentrations for Toxics - Final Summary Technical Report
| 09-09-069 | July 2009 |
Baseline Characterization of Nine Proposed Freshwater Sediment Reference Sites, 2008
| 09-03-032 | July 2009 |
Focus Sheet - Urban Waters Initiative
| 09-09-172 | June 2009 |
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2008 Sampling Results
| 09-03-030 | June 2009 |
POSTER: Use of Fluorescent Tracer Particles in the Lower Duwamish Waterway
| 09-03-029 | June 2009 |
Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report
| 09-10-045 | May 2009 |
Lower Duwamish Waterway RM 0.9-1.0 East (Slip 1) Source Control Action Plan
| 09-09-084 | May 2009 |
Focus Puget Sound - Port Gardner and the Snohomish Estuary
| 09-09-065 | May 2009 |
POSTER: The Sediment Quality Triad Index: An Indicator for Puget Sound & A Baseline (1997-2003) Update
| 09-03-024 | May 2009 |
POSTER: Sediment Quality in the Bays and Inlets of the San Juan Islands, Eastern Strait of Juan De Fuca, and Admiralty Inlet
| 09-03-023 | May 2009 |
POSTER: Polybrominated Diphenyl Ethers (PBDES) in Puget Sound Sediments (2004-2008)
| 09-03-022 | May 2009 |
PBT Trend Monitoring: Lead in Suspended Particulate Matter, 2008
| 09-03-020 | May 2009 |
Lower Duwamish Waterway RM 2.0-2.3 East (Slip 3 to Seattle Boiler Works) Source Control Action Plan - Final Report
| 09-09-081 | April 2009 |
Quality Assurance Project Plan: New Zealand Mud Snail Potassium-Chloride and Magnesium-Chloride Bioassay.
| 09-03-109 | April 2009 |
Lower Duwamish Waterway RM 3.7-3.9 East (Early Action Area 6) - Source Control Action Plan
| 09-09-082 | March 2009 |
Quality Assurance Project Plan: General Characterization of PCBs in South Lake Washington Sediments.
| 09-03-106 | March 2009 |
Sediment Trap Monitoring in Four Inlets of South Puget Sound
| 09-03-006 | February 2009 |
Irrigation Canal Effects on Copper Levels in Water and Sediment of the Mid-Columbia and Wenatchee Rivers
| 09-03-005 | February 2009 |
Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills
| 09-03-004 | January 2009 |