Publications Home



Watersheds (1946 publications 1960-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1997 · 1996 · 1995 · 1994 · 1993 · 1992 · 1991 · 1990 · 1989 · 1988 · 1987 · 1986 · 1985 ·
1984 · 1983 · 1982 · 1981 · 1980 · 1979 · 1978 · 1977 · 1976 · 1975 · 1974 · 1973 · 1972 · 1971 · 1970 · 1969 · 1968 · 1967 · 1966 · 1965 ·
1964 · 1963 · 1962 · 1960 ·

Title (link to summary)NumberDate (released or updated)
Colville River Dissolved Oxygen Total Maximum Daily Load: Submittal Report 03-10-029December 2003
Quality Assurance Project Plan: Verification of 303(d) Listed Sites in Northwest, Central, and Eastern Regions of Washington State 03-03-112December 2003
Oceanographic Changes in Puget Sound and the Strait of Juan de Fuca during the 2000-01 Drought. Article in Canadian Water Resources Journal, Vol. 28, No. 4, p. 715-728 (2003). 03-03-053December 2003
Final EIS - Dungeness River Agricultural Water Users Association Comprehensive Water Conservation Plan 03-11-016November 2003
Wenatchee National Forest Water Temperature Total Maximum Daily Load: Technical Report 03-10-063November 2003
A Framework for Delineating Channel Migration Zones 03-06-027November 2003
Water Quality Program Responsiveness Summary--Fiscal Year 2004 TMDL Priority List 03-10-083October 2003
Meeting Notice: Mosquito Control Methods To Be Revised 03-10-081October 2003
North Creek Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan 03-10-047October 2003
Quality Assurance Project Plan: Little Squalicum Creek Biological Toxicity Assessment 03-03-110October 2003
Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device 03-03-108October 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River 03-03-107October 2003
Padden Creek Pesticide Study: Final Report 03-03-048October 2003
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003 03-03-046October 2003
Focus on Little Klickitat River 03-10-075September 2003
Development of Freshwater Sediment Quality Values for Use in Washington State: Phase II Report 03-09-088September 2003
Aquatic Plants Technical Assistance Program, 2002 Activity Report 03-03-033September 2003
Upper White Watershed Spring Chinook Redd, Scour, and Cross-Section Assessments: 1995 - 2001 03-10-071August 2003
Quality Assurance Project Plan: Lake Bacteria Sampling Project 03-03-201August 2003
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study 03-03-106August 2003
Data Summary: Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen 03-03-023August 2003
Total Maximum Daily Load for Lower Snake River Total Dissolved Gas 03-03-020August 2003
Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River 04-03-203July 2003
Focus on Public Involvement with Your Community’s Water Quality 03-10-067July 2003
Inner Bellingham Bay Contaminated Sediments TMDL: Detailed Implementation Plan 03-10-057July 2003
Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan 03-10-042July 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan 03-03-105July 2003
Symposium Article: Total Maximum Daily Load Effectiveness Monitoring Strategy for Washington State 03-03-039July 2003
TMDL Technical Assessment of DDT and PCBs in the Lower Okanogan River Basin 03-03-013July 2003
Focus on Proposed Water Cleanup Plans 03-10-056June 2003
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report 03-10-055June 2003
Little Klickitat River Watershed Temperature Total Maximum Daily Load: Submittal Report 03-10-046June 2003
Focus on Cleaning Up Water Pollution 03-10-040June 2003
Focus on Water Temperatures in the Lower Skagit River Tributaries 03-10-039June 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Glossary, Bibliography, Cost Analysis, and Response to Comments 03-10-038DJune 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 7 and 8 03-10-038CJune 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 5 and 6 03-10-038BJune 2003
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapter 4 Maps 03-10-038AmapsJune 2003
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapters 1 through 4 03-10-038AJune 2003
Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report 03-10-032June 2003
Lower Snohomish River Tributaries Fecal Coliform Bacteria Total Maximum Daily Load:Detailed Implementation Plan 03-10-031June 2003
Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring, Revision of 1995 Version 03-03-200June 2003
Frequently Asked Questions about Mercury in Bass 03-03-037June 2003
Focus on Mercury in Fish: Study finds elevated levels in Washington fish 03-03-036June 2003
River and Stream Ambient Monitoring Report for Water Year 2002 03-03-032June 2003
Condition of Fresh Waters in Washington State for the Year 2002: Technical Appendix 03-03-031June 2003
Condition of Fresh Waters in Washington State for the Year 2002 03-03-030June 2003
Ecology/Health Responses to Public Comments Received on the Draft Mercury Chemical Action Plan 03-03-029June 2003
Effectiveness Monitoring for Fecal Coliform Total Maximum Daily Loads in Pipers Creek 03-03-027June 2003
Mercury in Edible Fish Tissue and Sediments from Selected Lakes and Rivers of Washington State 03-03-026June 2003
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study 03-03-021June 2003
Focus on Moses Lake Water Cleanup Plan 03-10-048May 2003
Focus on North Creek Water Quality Action Plan 03-10-043May 2003
Lake Chelan DDT/PCB Watershed Cleanup Plan 03-10-035May 2003
Colville River Watershed Bacteria Total Maximum Daily Load: Submittal Report - Amended 03-10-030May 2003
Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds: A Study for the Washington State Department of Agriculture by the Washington State Department of Ecology 03-03-104May 2003
Investigation of Background Inorganic and Organic Arsenic in Four Washington Lakes 03-03-024May 2003
Teanaway Temperature Total Maximum Daily Load: Detailed Implementation Plan 03-10-025April 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington 03-03-103April 2003
Flow Summary for Gaging Stations on the Stillaguamish River and Selected Tributaries, May through October 2001 03-03-019April 2003
Verification of 1998 303(d) PCB Listing, Inner Budd Inlet 03-03-016April 2003
Skokomish River Detailed Implementation Plan for Fecal Coliform Bacteria 02-10-072April 2003
River Basin Characterization 99-118March 2003
A Guide to Instream Flow Setting in Washington State 03-11-007March 2003
Washington Water Acquisition Program: Finding Water to Restore Streams 03-11-005March 2003
Focus on White River pH Water Cleanup Plan 03-10-026March 2003
Focus on South Prairie Creek 03-10-024March 2003
Focus on Water Cleanup Plans 03-10-010March 2003
Focus on Water Quality Permit Fees 03-10-008March 2003
Focus on National Pollutant Discharge Elimination System (NPDES) Permits for Aquatic Pest Control 03-10-007March 2003
An Assessment of Watershed Planning - Report to the Legislature 03-06-009March 2003
Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation 03-03-102March 2003
Groundwater/Surface Water Interactions in the Upper Sammamish River: A Preliminary Analysis 03-03-015March 2003
Sediment Toxicity Near Gas Works Park, Lake Union, Seattle 03-03-014March 2003
Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 2001 03-03-012March 2003
Quality Assurance Project Plan: Henderson and Nisqually TMDL Study 03-03-100February 2003
Total Mercury Concentrations among Fish and Crayfish Inhabiting Different Trophic Levels in Lake Whatcom, Washington. Article in Journal of Freshwater Ecology, Volume 71, Number 4, p. 621-633, December 2002. 03-03-008February 2003
Moses Lake Total Maximum Daily Load Groundwater Study 03-03-005February 2003
Norfolk Combined Sewer Overflow (Duwamish River) Sediment Cap Recontamination, Phase I Investigation 03-03-004February 2003
Washington State Mercury Chemical Action Plan 03-03-001February 2003
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan 03-10-004January 2003
Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington 03-03-002January 2003