Title (link to summary) | Number | Date (released or updated) |
Colville River Dissolved Oxygen Total Maximum Daily Load: Submittal Report
| 03-10-029 | December 2003 |
Quality Assurance Project Plan: Verification of 303(d) Listed Sites in Northwest, Central, and Eastern Regions of Washington State
| 03-03-112 | December 2003 |
Oceanographic Changes in Puget Sound and the Strait of Juan de Fuca during the 2000-01 Drought. Article in Canadian Water Resources Journal, Vol. 28, No. 4, p. 715-728 (2003).
| 03-03-053 | December 2003 |
Final EIS - Dungeness River Agricultural Water Users Association Comprehensive Water Conservation Plan
| 03-11-016 | November 2003 |
Wenatchee National Forest Water Temperature Total Maximum Daily Load: Technical Report
| 03-10-063 | November 2003 |
A Framework for Delineating Channel Migration Zones
| 03-06-027 | November 2003 |
Water Quality Program Responsiveness Summary--Fiscal Year 2004 TMDL Priority List
| 03-10-083 | October 2003 |
Meeting Notice: Mosquito Control Methods To Be Revised
| 03-10-081 | October 2003 |
North Creek Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan
| 03-10-047 | October 2003 |
Quality Assurance Project Plan: Little Squalicum Creek Biological Toxicity Assessment
| 03-03-110 | October 2003 |
Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device
| 03-03-108 | October 2003 |
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River
| 03-03-107 | October 2003 |
Padden Creek Pesticide Study: Final Report
| 03-03-048 | October 2003 |
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003
| 03-03-046 | October 2003 |
Focus on Little Klickitat River
| 03-10-075 | September 2003 |
Development of Freshwater Sediment Quality Values for Use in Washington State: Phase II Report
| 03-09-088 | September 2003 |
Aquatic Plants Technical Assistance Program, 2002 Activity Report
| 03-03-033 | September 2003 |
Upper White Watershed Spring Chinook Redd, Scour, and Cross-Section Assessments: 1995 - 2001
| 03-10-071 | August 2003 |
Quality Assurance Project Plan: Lake Bacteria Sampling Project
| 03-03-201 | August 2003 |
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study
| 03-03-106 | August 2003 |
Data Summary: Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen
| 03-03-023 | August 2003 |
Total Maximum Daily Load for Lower Snake River Total Dissolved Gas
| 03-03-020 | August 2003 |
Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River
| 04-03-203 | July 2003 |
Focus on Public Involvement with Your Community’s Water Quality
| 03-10-067 | July 2003 |
Inner Bellingham Bay Contaminated Sediments TMDL: Detailed Implementation Plan
| 03-10-057 | July 2003 |
Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan
| 03-10-042 | July 2003 |
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan
| 03-03-105 | July 2003 |
Symposium Article: Total Maximum Daily Load Effectiveness Monitoring Strategy for Washington State
| 03-03-039 | July 2003 |
TMDL Technical Assessment of DDT and PCBs in the Lower Okanogan River Basin
| 03-03-013 | July 2003 |
Focus on Proposed Water Cleanup Plans
| 03-10-056 | June 2003 |
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report
| 03-10-055 | June 2003 |
Little Klickitat River Watershed Temperature Total Maximum Daily Load: Submittal Report
| 03-10-046 | June 2003 |
Focus on Cleaning Up Water Pollution
| 03-10-040 | June 2003 |
Focus on Water Temperatures in the Lower Skagit River Tributaries
| 03-10-039 | June 2003 |
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Glossary, Bibliography, Cost Analysis, and Response to Comments
| 03-10-038D | June 2003 |
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 7 and 8
| 03-10-038C | June 2003 |
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 5 and 6
| 03-10-038B | June 2003 |
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapter 4 Maps
| 03-10-038Amaps | June 2003 |
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapters 1 through 4
| 03-10-038A | June 2003 |
Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report
| 03-10-032 | June 2003 |
Lower Snohomish River Tributaries Fecal Coliform Bacteria Total Maximum Daily Load:Detailed Implementation Plan
| 03-10-031 | June 2003 |
Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring, Revision of 1995 Version
| 03-03-200 | June 2003 |
Frequently Asked Questions about Mercury in Bass
| 03-03-037 | June 2003 |
Focus on Mercury in Fish: Study finds elevated levels in Washington fish
| 03-03-036 | June 2003 |
River and Stream Ambient Monitoring Report for Water Year 2002
| 03-03-032 | June 2003 |
Condition of Fresh Waters in Washington State for the Year 2002: Technical Appendix
| 03-03-031 | June 2003 |
Condition of Fresh Waters in Washington State for the Year 2002
| 03-03-030 | June 2003 |
Ecology/Health Responses to Public Comments Received on the Draft Mercury Chemical Action Plan
| 03-03-029 | June 2003 |
Effectiveness Monitoring for Fecal Coliform Total Maximum Daily Loads in Pipers Creek
| 03-03-027 | June 2003 |
Mercury in Edible Fish Tissue and Sediments from Selected Lakes and Rivers of Washington State
| 03-03-026 | June 2003 |
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study
| 03-03-021 | June 2003 |
Focus on Moses Lake Water Cleanup Plan
| 03-10-048 | May 2003 |
Focus on North Creek Water Quality Action Plan
| 03-10-043 | May 2003 |
Lake Chelan DDT/PCB Watershed Cleanup Plan
| 03-10-035 | May 2003 |
Colville River Watershed Bacteria Total Maximum Daily Load: Submittal Report - Amended
| 03-10-030 | May 2003 |
Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds: A Study for the Washington State Department of Agriculture by the Washington State Department of Ecology
| 03-03-104 | May 2003 |
Investigation of Background Inorganic and Organic Arsenic in Four Washington Lakes
| 03-03-024 | May 2003 |
Teanaway Temperature Total Maximum Daily Load: Detailed Implementation Plan
| 03-10-025 | April 2003 |
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington
| 03-03-103 | April 2003 |
Flow Summary for Gaging Stations on the Stillaguamish River and Selected Tributaries, May through October 2001
| 03-03-019 | April 2003 |
Verification of 1998 303(d) PCB Listing, Inner Budd Inlet
| 03-03-016 | April 2003 |
Skokomish River Detailed Implementation Plan for Fecal Coliform Bacteria
| 02-10-072 | April 2003 |
River Basin Characterization
| 99-118 | March 2003 |
A Guide to Instream Flow Setting in Washington State
| 03-11-007 | March 2003 |
Washington Water Acquisition Program: Finding Water to Restore Streams
| 03-11-005 | March 2003 |
Focus on White River pH Water Cleanup Plan
| 03-10-026 | March 2003 |
Focus on South Prairie Creek
| 03-10-024 | March 2003 |
Focus on Water Cleanup Plans
| 03-10-010 | March 2003 |
Focus on Water Quality Permit Fees
| 03-10-008 | March 2003 |
Focus on National Pollutant Discharge Elimination System (NPDES) Permits for Aquatic Pest Control
| 03-10-007 | March 2003 |
An Assessment of Watershed Planning - Report to the Legislature
| 03-06-009 | March 2003 |
Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation
| 03-03-102 | March 2003 |
Groundwater/Surface Water Interactions in the Upper Sammamish River: A Preliminary Analysis
| 03-03-015 | March 2003 |
Sediment Toxicity Near Gas Works Park, Lake Union, Seattle
| 03-03-014 | March 2003 |
Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 2001
| 03-03-012 | March 2003 |
Quality Assurance Project Plan: Henderson and Nisqually TMDL Study
| 03-03-100 | February 2003 |
Total Mercury Concentrations among Fish and Crayfish Inhabiting Different Trophic Levels in Lake Whatcom, Washington. Article in Journal of Freshwater Ecology, Volume 71, Number 4, p. 621-633, December 2002.
| 03-03-008 | February 2003 |
Moses Lake Total Maximum Daily Load Groundwater Study
| 03-03-005 | February 2003 |
Norfolk Combined Sewer Overflow (Duwamish River) Sediment Cap Recontamination, Phase I Investigation
| 03-03-004 | February 2003 |
Washington State Mercury Chemical Action Plan
| 03-03-001 | February 2003 |
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan
| 03-10-004 | January 2003 |
Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington
| 03-03-002 | January 2003 |