Publications Home



Watersheds (1946 publications 1960-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1997 · 1996 · 1995 · 1994 · 1993 · 1992 · 1991 · 1990 · 1989 · 1988 · 1987 · 1986 · 1985 ·
1984 · 1983 · 1982 · 1981 · 1980 · 1979 · 1978 · 1977 · 1976 · 1975 · 1974 · 1973 · 1972 · 1971 · 1970 · 1969 · 1968 · 1967 · 1966 · 1965 ·
1964 · 1963 · 1962 · 1960 ·

Title (link to summary)NumberDate (released or updated)
2004 Report to the Legislature: Watershed Planning and Instream Flow Setting Progress 04-11-035December 2004
The Chehalis/Grays Harbor Watershed Dissolved Oxygen, Temperature, and Fecal Coliform Bacteria TMDL: Detailed Implementation (Cleanup) Plan 04-10-065December 2004
Dungeness River and Matriotti Creek Post-Total Maximum Daily Load Data Review 04-03-053December 2004
Clean Water Strategy for addressing Bacteria Pollution in Dungeness Bay and Watershed and Water Cleanup Detailed Implementation Plan 04-10-059November 2004
Quality Assurance Project Plan: Verification of 303(d) Listings for Fish Tissue in the Skagit and Pend Oreille Rivers 04-03-115November 2004
Results of a Screening Analysis for Pharmaceuticals in Wastewater Treatment Plant Effluents, Wells, and Creeks in the Sequim-Dungeness Area 04-03-051November 2004
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, April to December, 2003: A Cooperative Study Conducted by the Washington State Departments of Ecology and Agriculture 04-03-048November 2004
Quality Assurance Project Plan: Old Stillaguamish River Channel Diel Surveys. 04-03-113October 2004
DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County: Total Maximum Daily Load Assessment 04-03-043October 2004
A Total Maximum Daily Load Evaluation for Chlorinated Pesticides and PCBs in the Walla Walla River 04-03-032October 2004
Upper White Watershed Temperature Data Report: 1989 to 2003 04-10-061September 2004
Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell 04-03-206September 2004
Quality Assurance Project Plan: Fecal Coliform Bacteria TMDL for Oakland Bay-Hammersley Inlet and Tributaries 04-03-111September 2004
Quality Assurance Project Plan: Naches River Temperature Total Maximum Daily Load 04-03-110September 2004
Quality Assurance Project Plan: Pend Oreille River Temperature Total Maximum Daily Load Technical Study 04-03-109September 2004
Willapa River Watershed Temperature Total Maximum Daily Load Study 04-03-024September 2004
Water Quality Program Responsiveness Summary: Fiscal Year 2005 Water Cleanup Plans TMDLs 04-10-071August 2004
Washington's Water Quality Management Plan to Control Nonpoint Sources of Pollution - Volume 1 04-10-063August 2004
DRAFT Wetlands in Washington State, Volume 2: Guidance for Protecting and Managing Wetlands 04-06-024August 2004
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004 04-03-038August 2004
Data Summary: Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study 04-03-037August 2004
Condition of Fresh Waters in Washington State for the Year 2003: Technical Appendix 04-03-034August 2004
Whatcom Creek Fecal Coliform Total Maximum Daily Load Study 04-03-015August 2004
Issaquah Creek Basin Water Cleanup Plan for Fecal Coliform Bacteria: Submittal Report 04-10-055July 2004
Guidance for Integrated Aquatic Vegetation: Management Plans 04-10-053July 2004
Cómo Comentar Eficazmente sobre Proyectos de Limpiar las Aguas 04-10-039esJuly 2004
Quality Assurance Project Plan: Lake Tapps Monitoring 04-03-204July 2004
Quality Assurance Project Plan: Lake Bacteria Sampling Project 04-03-202July 2004
Quality Assurance Project Plan: Effects of Small-Scale Gold Dredging on Metals Concentrations in the Similkameen River 04-03-108July 2004
The impact of endothall on the aquatic plant community of Kress Lake, Washington. Journal of Aquatic Plant Management 42: 109-114. 04-03-057July 2004
Verification of 303(d)-listed Sites in Northwest, Central, and Eastern Regions of Washington State 04-03-035July 2004
River and Stream Water Quality Monitoring Report for Water Year 2003 04-03-031July 2004
Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study 04-03-017July 2004
Focus on Lake-Friendly Landscaping 04-10-046June 2004
How to Comment Effectively on Water Cleanup Plans 04-10-039June 2004
Supplemental Environmental Impact Statement Assessments of Aquatic Herbicides: Volume 5: Triclopyr 04-10-015June 2004
Flow Summary for Gaging Stations on the Willapa River and Selected Tributaries 04-03-023June 2004
Mercury in Lake Whatcom Sediments: Spatial Distribution, Depositional History, and Tributary Inputs 04-03-019June 2004
Total Maximum Daily Load for Total Dissolved Gas in the Mid-Columbia River and Lake Roosevelt 04-03-002June 2004
Cottage Lake Total Maximum Daily Load Analysis: Submittal Report 03-10-085June 2004
Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load: Submittal Report 04-10-041May 2004
Wind River Watershed Temperature Total Maximum Daily Load:Detailed Implementation Plan 04-10-037May 2004
Nutrient Criteria Development in Washington State - Phosphorus 04-10-033May 2004
Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study 04-03-107May 2004
Quality Assurance Project Plan: Tributaries to Totten, Eld, and Little Skookum Inlets Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study 04-03-106May 2004
North Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations 04-03-022May 2004
Groundwater Contributions to Siebert Creek (Clallam County) During the Summer of 2003 04-03-021May 2004
Chehalis River Basin, WRIAs 22 and 23, Fish Habitat Analysis Using the Instream Flow Incremental Methodology 04-11-006April 2004
Water Cleanup Plan for Bacteria in Dungeness Bay:Total Maximum Daily Load (TMDL) Submittal Report 04-10-026April 2004
Draft Washington State Wetland Rating System for Western Washington - Revised 04-06-014April 2004
DRAFT - Guidance on Wetland Mitigation in Washington State, Part 2: Guidelines for Developing Wetland Mitigation Plans and Proposal 04-06-013bApril 2004
DRAFT - Guidance on Wetland Mitigation in Washington State, Part 1: Laws, Rules, Policies and Guidance Related to Wetland Mitigation 04-06-013aApril 2004
Little Squalicum Creek Screening Level Assessment 04-03-014April 2004
Assessment of Changes in Water Quality in the Spokane River Between Riverside State Park and the Washington-Idaho Border 04-03-007April 2004
Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations 04-03-004April 2004
Level 1 Technical Assessment: WRIA 60, Kettle River Watershed 04-06-012March 2004
Quality Assurance Project Plan: Snoqualmie River Total Maximum Daily Load Effectiveness Evaluation 04-03-201March 2004
Dungeness Bay Fecal Coliform Bacteria Total Maximum Daily Load Study 04-03-012March 2004
Trophic State Census of Washington State Lakes by Satellite Imagery 04-03-011March 2004
Stillaguamish River Watershed Temperature Total Maximum Daily Load Study 04-03-010March 2004
Entiat and Mad Rivers Fish Habitat Analysis Using the Instream Flow Incremental Methodology 95-166February 2004
Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study 04-03-103February 2004
Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen 04-03-006February 2004
Third Screening Investigation of Water and Sediment Quality of Creeks in Ten Washington Mining Districts, with Emphasis on Metals 04-03-005February 2004
Lower Similkameen River Arsenic Total Maximum Daily Load: Submittal Report 03-10-074February 2004
2003 Report to the Legislature: Instream Flow Setting Progress across the State 04-11-001January 2004
Focus on Cottage Lake Cleanup Plan 04-10-013January 2004
Meeting Notice: Workshops on Water Quality Assessment Including Update of "Polluted Waters" List 04-10-006January 2004
Focus on Water Cleanup Plans 04-10-002January 2004
Focus on finishing and using local watershed plans 04-06-02January 2004
Focus on finishing and using local watershed plans 04-06-002January 2004
Quality Assurance Project Plan: Spatial Extent of Dioxin/Furan Contaminated Sediments in Dillenbaugh Creek 04-03-101January 2004
Squalicum Creek Toxics Screening Study 04-03-003January 2004
Lower Skagit River Tributaries Temperature Total Maximum Daily Load Study 04-03-001January 2004
Johnson Creek Watershed Bacteria Total Maximum Daily Load: Detailed Implementation Plan 03-10-079January 2004