Title (link to summary) | Number | Date (released or updated) |
McAllister Creek Fecal Coliform Bacteria Monitoring Summer 2009
| 09-10-094 | December 2009 |
Freshwater Algae Control Program Report to the Washington State Legislature
| 09-10-082 | December 2009 |
Clarks Creek Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan
| 09-10-081 | December 2009 |
Responses to Comments: Draft Guidance on Selecting Mitigation Sites using a Watershed Approach
| 09-06-033 | December 2009 |
Selecting Wetland Mitigation Sites Using a Watershed Approach (Western Washington)
| 09-06-032 | December 2009 |
Water Quality Study Design (Quality Assurance Project Plan): Deschutes River Multi-parameter Total Maximum Daily Load Effectiveness Monitoring Pilot Project.
| 09-03-133 | December 2009 |
Focus on Limiting the Use of Copper and Other Substances in Vehicle Brake Pads
| 09-03-057 | December 2009 |
Frequently Asked Questions: Yakima River Watershed Toxics Study:: Progress Update
| 09-10-088 | November 2009 |
Quality Assurance Project Plan: Assessment of Aquatic Toxicity in North Creek, Gig Harbor.
| 09-03-132 | November 2009 |
Quality Assurance Project Plan: Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River
| 09-03-119 | November 2009 |
Montesano Groundwater Investigation of Leaking Underground Storage Tanks: September 2008 and April 2009
| 09-03-056 | November 2009 |
Washington State Toxics Monitoring Program: Freshwater Fish Tissue Component, 2008
| 09-03-055 | November 2009 |
Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River
| 09-03-028 | November 2009 |
Wheel-of-Water: Turns heads toward terrific new behaviors to protect aquatic treasures
| 09-10-084 | October 2009 |
Door-to-door Outreach: Helping Streams One Home at a Time
| 09-10-079 | October 2009 |
Wenatchee River Watershed Dissolved Oxygen and pH TMDL: Water Quality Improvement Plan -- DRAFT
| 09-10-075 | October 2009 |
Quality Assurance Project Plan: Lower White River pH Nutrients Study.
| 09-03-131 | October 2009 |
Quality Assurance Project Plan: Deschutes River Continuous Nitrate Monitoring
| 09-03-130 | October 2009 |
Quality Assurance Project Plan: Lake Ozette Watershed PBT Monitoring: Speciated Mercury in Stream Surface Waters
| 09-03-129 | October 2009 |
Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway.
| 09-03-124 | October 2009 |
Quality Assurance Project Plan: Leach Creek (Pierce County) Mercury and Copper Monitoring.
| 09-03-128 | September 2009 |
Quality Assurance Project Plan: White Salmon River Fecal Coliform Bacteria Compliance Monitoring
| 09-03-127 | September 2009 |
Quality Assurance Project Plan: Monitoring Seep Water from the Port Angeles Landfill to an Intertidal Area
| 09-03-125 | September 2009 |
Quality Assurance Monitoring Plan: Continuous Monitoring for Oxygen, Temperature, pH, and Conductivity in Statewide Rivers and Streams
| 09-03-122 | September 2009 |
Dissolved Oxygen and pH Modeling of a Periphyton Dominated, Nutrient Enriched River. Article in Journal of Environmental Engineering.
| 09-03-049 | September 2009 |
Lower Duwamish Waterway: Tracing Short-Term Movements of Suspended Sediment, Summary Report
| 09-03-048 | September 2009 |
Mercury Sources to Lake Ozette and Lake Dickey: Highly Contaminated Remote Coastal Lakes, Washington State, USA. Article in the journal, Water, Air, & Soil Pollution, Vol 208, No 1-4, p 275-286.
| 09-03-047 | September 2009 |
Focus on Puget Sound's Urban Bays: Sediment Quality in Elliott Bay, 1998 to 2007
| 09-03-043 | September 2009 |
Washington State Dissolved Oxygen Standard: A Review and Discussion of Freshwater Intragravel Criteria Development
| 09-03-039 | September 2009 |
POSTER: New Visual Tools to Use with Stream Temperature and Shade Modeling
| 09-03-038 | September 2009 |
Urban Waters Initiative, 2007: Sediment Quality Changes in Elliott Bay since 1998 (Summary)
| 09-03-031 | September 2009 |
Focus on River and Stream Water Quality Monitoring Program
| 09-03-009 | September 2009 |
Focus on Water Resources in the Lower Spokane River Watershed (WRIA 54)
| 09-11-023 | August 2009 |
South Fork Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report
| 09-10-060 | August 2009 |
Revised Small Business Economic Impact Statement: Chapter 173-700 WAC - Wetland Mitigation Banks
| 09-06-027 | August 2009 |
Final Cost-Benefit and Least Burdensome Alternative Analysis: Chapter 173-700 WAC -Wetland Mitigation Banking
| 09-06-026 | August 2009 |
Watershed Characterization and Analysis of South Lewis County
| 09-06-025 | August 2009 |
Implementation Plan for the Adoption of Chapter 173-700 WAC, Wetland Mitigation Banks
| 09-06-024 | August 2009 |
Final Environmental Impact Statement: Washington State's Rule on Wetland Mitigation Banks, WAC 173-700 Wetland Mitigation Banks
| 09-06-023 | August 2009 |
Concise Explanatory Statement and Responsiveness Summary for the Adoption of Chapter 173-700, Wetland Mitigation Banks
| 09-06-022 | August 2009 |
Rule Adoption Notice - Wetland Mitigation Banks, Chapter 173-700 WAC
| 09-06-021 | August 2009 |
Quality Assurance Project Plan: Potential Impacts from Mercury Used in Historic Gold Mining on Six Rivers and Streams
| 09-03-123 | August 2009 |
Quality Assurance Project Plan: Skagit-Samish Watershed Intensive Surface Water Sampling for Pesticides in Salmonid-Bearing Streams
| 09-03-120 | August 2009 |
Quality Assurance Project Plan: Control of Toxic Chemicals in Puget Sound Phase 3: Characterization of Toxic Chemicals in Puget Sound and Selected Major Tributaries
| 09-03-118 | August 2009 |
Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008
| 09-03-044 | August 2009 |
Salmon Creek Nonpoint Source Pollution Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report
| 09-03-042 | August 2009 |
River and Stream Water Quality Monitoring Report, Water Year 2008
| 09-03-041 | August 2009 |
Streamflow Summary for Gaging Stations on the Snoqualmie River and Selected Tributaries, 2006
| 09-03-040 | August 2009 |
Wenatchee River Watershed Dissolved Oxygen and pH Total Maximum Daily Load: Water Quality Improvement Report
| 08-10-062 | August 2009 |
Total Maximum Daily Loading (TMDL) to Limit Discharges of 2,3,7,8-TCDD (Dioxin) to the Columbia River Basin
| 09-10-058 | July 2009 |
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Implementation Plan
| 09-10-039 | July 2009 |
Samish Bay Watershed Fecal Coliform Bacteria Total Maximum Daily Load - Volume 2
| 09-10-019 | July 2009 |
Watershed Characterization and Analysis of Clark County
| 09-06-019 | July 2009 |
Quality Assurance Project Plan: Crab Creek Alternate Water Supply Route Study: Water Quality Monitoring
| 09-03-116 | July 2009 |
Quality Assurance Project Plan: Supplemental: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study
| 09-03-114 | July 2009 |
Baseline Characterization of Nine Proposed Freshwater Sediment Reference Sites, 2008
| 09-03-032 | July 2009 |
Investing in Southwest Washington and the Olympic Peninsula Communities
| 09-01-011 | July 2009 |
Lake Sawyer Total Phosphorus TMDL Water Quality Implementation Plan
| 09-10-053 | June 2009 |
Executive Summary of Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report
| 09-10-030a | June 2009 |
Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report
| 09-10-030 | June 2009 |
Surface Water/Groundwater Exchange Along the East Fork Lewis River (Clark County), 2005
| 09-03-037 | June 2009 |
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2008 Sampling Results
| 09-03-030 | June 2009 |
Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report
| 09-10-045 | May 2009 |
Straight to Implementation: Cleaner Water Faster
| 09-10-040 | May 2009 |
Effect of Fluridone on Macrophytes and Fish in a Coastal Washington Lake. Article in the Journal of Aquatic Plant Management.
| 09-03-033 | May 2009 |
POSTER: Polybrominated Diphenyl Ethers (PBDES) in Puget Sound Sediments (2004-2008)
| 09-03-022 | May 2009 |
PBT Trend Monitoring: Lead in Suspended Particulate Matter, 2008
| 09-03-020 | May 2009 |
What are Riparian Areas?
| 92-br-003 | April 2009 |
Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 2006
| 09-10-034 | April 2009 |
Quality Assurance Project Plan: Audubon Lake's Connection to Upper Crab Creek (Lincoln County): Source Assessment
| 09-03-112 | April 2009 |
Quality Assurance Project Plan: PBDE Flame Retardants in Spokane River Fish Tissues and Osprey Eggs
| 09-03-108 | April 2009 |
Quality Assurance Project Plan: Okanogan River DDT and PCB Total Maximum Daily Load Effectiveness Monitoring
| 09-03-107 | April 2009 |
High-resolution Porewater Sampling Near the Groundwater/Surface Water Interface
| 09-03-017 | April 2009 |
Addendum to Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring
| 05-03-201ADD1 | April 2009 |
Addendum 3 to Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat in Two Index Watersheds
| 03-03-104ADD3 | April 2009 |
Barker Creek - The Future of a Watershed
| 09-10-029 | March 2009 |
City of Olympia -- Decatur Street LID Demonstration Project
| 09-10-022 | March 2009 |
Solving Septic Impacts in the Colville Watershed
| 09-10-021 | March 2009 |
Small Business Economic Impact Statement - Chapter 173-700 Wetland Mitigation Banking
| 09-06-014 | March 2009 |
Rule Proposal Notice: Wetland Mitigation Banks, Chapter 173-700 WAC
| 09-06-011 | March 2009 |
Preliminary Cost Benefit and Least Burden Analysis - Chapter 173-700 WAC Compensory Wetland Mitigation Banks
| 09-06-002 | March 2009 |
Quality Assurance Project Plan: General Characterization of PCBs in South Lake Washington Sediments.
| 09-03-106 | March 2009 |
Quality Assurance Project Plan: Innovative Temperature Total Maximum Daily Load Pilot Study
| 09-03-105 | March 2009 |
Entiat River Basin: Regressions for Predicting Gaged Streamflows
| 09-03-016 | March 2009 |
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, and PBDEs in Washington Rivers and Lakes, 2007
| 09-03-013 | March 2009 |
Focus On Wetland Delineation Forms
| 09-06-010 | February 2009 |
Quality Assurance Project Plan: Dungeness Bay and Lower Dungeness River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Effectiveness Monitoring
| 09-03-104 | February 2009 |
Montesano Groundwater Investigation of Leaking Underground Storage Tanks, October 2007 and April 2008
| 09-03-011 | February 2009 |
PBDE and Dioxin/Furans in Spokane Stormwater
| 09-03-010 | February 2009 |
POSTER: Pesticides in Salmonid-bearing Streams in an Urban and Agricultural Watershed of the Salish Basin
| 09-03-008 | February 2009 |
Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek
| 09-03-007 | February 2009 |
Irrigation Canal Effects on Copper Levels in Water and Sediment of the Mid-Columbia and Wenatchee Rivers
| 09-03-005 | February 2009 |
FOCUS: Safe Ballast Discharge (updated 01-09)
| 99-1309 | January 2009 |
Adaptive Management Team Total Dissolved Gas in the Columbia and Snake Rivers: Evaluation of the 115 Percent Total Dissolved Gas Forebay Requirement
| 09-10-002 | January 2009 |
Summary of Watershed Characterization and Analysis Project for Clark County
| 09-06-003 | January 2009 |
Water Quality Study Design (Quality Assurance Project Plan): Liberty Bay Tributaries Fecal Coliform Bacteria Total Maximum Daily Load
| 09-03-102 | January 2009 |
Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills
| 09-03-004 | January 2009 |
Washington State Toxics Monitoring Program: Freshwater Fish Tissue Component, 2007
| 09-03-003 | January 2009 |
Streamflow Summary for Gaging Stations on the East Fork Lewis River, 2005-06
| 09-03-002 | January 2009 |
Focus on Deschutes Watershed
| 08-10-103 | January 2009 |
Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation
| 01-03-064ADD1 | January 2009 |